BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2025 at 8:00 PM

Updated August 21, 2025

Site work for a road / highway in Laguna Niguel, California. Completed plans call for site work for a road / highway.

he work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the contract documents to construct the above stated project. The general items of work to be done hereunder consist of traffic control, traffic signal equipment upgrades at the following 5 intersections, and advance coordination/notification of residences and businesses that are impacted by the progression of work. Crown Valley Parkway/Niguel Road* Crown Valley Parkway/Nueva Vista Drive Golden Lantern/Bear Brand Road Alicia Parkway/Skate Park Way Alicia Parkway/Pacific Island Drive All work shall be completed within 45 working days from the date of the Notice to Proceed with Construction Activities, anticipated to start in September 2025. Bid Bond :Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%. Estimated Bid Value :$300,000 Start/Delivery Date :September 2025 Project Duration :45 Working Days Question Deadline 07/07/2025 at 12:00 PM PT Online Q&A :Yes. All Bidder questions about the meaning or intent of the Contract Documents shall be directed to the City in writing via PlanetBids Liquidated Damages :$1000 per Calendar Day

Award

Roads / Highways

$258,797.00

Public - City

Site Work

5

7

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
724
Active Projects
379
Bidding Soon
3,534
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

September 1, 2025

Project location map

Multiple Locations, Laguna Niguel, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.