BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Site work for a pipeline in Palo Alto, California. Completed plans call for site work for a pipeline.

The Gas Main Replacement Project 25 is aiming to replace approximately 25,600 linear feet of gas main pipelines with diameter of 2-inch, 4-inch, and 6-inch. The replacement includes installation of gas main pipelines under Matadero Creek and Barron Creek along Ross Road with Polyethylene (PE), natural gas service pipelines made of PVC, BWP, or undersized Polyethylene (PE), and the reconnection of natural gas service pipelines. This project was selected and awarded with a federal grant by the Department of Transporation for Natural Gas Distribution Infrastructure Safety and Modernization. It is anticipated that Work on the Project will be required to commence on or about approximately January 20, 2026. The anticipated time of completion is within Three Hundred eighty-six working days (386) after the commencement date specified in City's Notice to Proceed. Nothing in this provision is intended to bind the City to require commencement of the Work by the preceding time. For all Bids greater than $25,000, Bidders shall submit a Bid security in the amount of not less than ten percent (10%) of the aggregate amount of the Bid including all Bid Alternates. Bid security shall be submitted on or before the Bid due date, in accordance with the Bid Security section of this IFB. Question and Clarifications Due Date and Time : July 14, 2025, 1:00pm online Q & A

Award

Pipeline

$9,390,413.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

30

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
471
Active Projects
213
Bidding Soon
2,485
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

January 20, 2026

Project location map

Multiple Locations, Palo Alto, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.