EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Renovation of an educational facility in Kingston, Ontario. Completed plans call for the renovation of a educational facility.

St Lawrence College is issuing this Request for Proposal (RFP) to engaged qualified Audio-Visual contractors to design and implement a scalable, standardized AV system across its Brockville, Cornwall, and Kingston campuses. This initiative aims to modernize classroom environments and support advanced flexible learning methodologies. The AV solution must seamlessly integrate with Microsoft Teams and our Learning Management System (LMS), Blackboard Collaborate Ultra. The solution must deliver professional-grade audio and video, along with intuitive control systems that support flexible, high-quality learning experiences. This AV design will serve as a model for campus-wide standardization, ensuring consistency and reliability across learning spaces. The project will be two phases ; Phase 1 is the pilot phase and Phase 2 will follow successful completion and evaluation of Phase 1. The contract shall be two (2) phases; Phase 1 will be the pilot phase and is expected to span a period of 3 months from the date of award; The installation of stage (Phase 1) must be completed no later than October 17, 2025 while the evaluation stage (within Phase 1) will span for four (4) weeks from the date of initial completion and must be completed before November 28,2025. This phase will include deployment, testing, and refinement of AV systems in the selected Cornwall and Kingston Classrooms. The goal of Phase 1 is to validate system performance, integration, usability, and support models prior to broader rollout. Phase 2 will follow successful completion and evaluation of Phase 1; Phase 2 will be a contract of three (3) years term. The College is not under obligation to proceed to Phase 2 if Phase 1 is not satisfactory implemented. Phase1 pilot implementation will include one room in Kingston and one room in Cornwall. Phase 2 will cover the broader deployment and support of multiple new classroom AV system upgrades across all campuses. The phase 2 will also include ongoing coordination, installation, and optimization efforts aligned with institutional priorities and scheduling. Contractors shall provide a full AV solution, including: o Conceptual wiring diagrams o Provide reflected ceiling plans for all installed audio-visual equipment. Drawings must clearly indicate: o Equipment mounting locations o Required electrical outlets o Data drop locations (network cabling and types) o Conduit paths and sizes (if applicable) o Any coordination notes relevant to ceiling structures (e.g., T-bar, drywall, hard-lid, plenum access). o Provide elevation drawings for all installed audio-visual equipment. Drawings must include: o Equipment mounting heights and alignment o Wall backing requirements (type, dimensions, and location) o Electrical outlet placement and circuit specifications o Conduit sizing and routing o Data drop locations, types, and termination details o Detailed technical documentation o Complete Bill of Materials o Compliance with Audio Visual and Integrated Experience Association (AVIXIA) standards o Qualified staff (AVIXIA CTS, CTS-D, CTS-I certified) o On-site labor and logistical support o Clean and code-compliant installations o Any required labor and logistical support to have large items, such as displays, moved into the project space Question Acceptance Deadline: 2025/07/16 12:00:00 PM EDT Official bid documents must be obtained from www.merx.com.

Sub-Bidding

Educational

$200,000.00

Public - State/Provincial

Renovation

96

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
29
Bidding Soon
608
All Active Projects
275
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 22, 2025

img_map_placeholder

100 Portsmouth Ave, Kingston, ON


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Scalable Flexible Learning Classrooms

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.