BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work for a water / sewer project in Murray, Utah. Completed plans call for site work for a water / sewer project.

The general scope of work for the State Street Pipeline Replacement project includes providing expert design services for a new pipeline, including project management and coordination, quality control, identification of underground utilities, wetlands disturbance, and any other necessary permits, assistance with right-of-way identification, hydraulic analysis, preliminary and final pipeline design, valving and associated control structure design, corrosion protection, cost estimating, and construction management and inspection. Award of Consulting Contract: on or after August 13, 2025 Comment on the acceptability of the enclosed Professional Consulting Services Agreement (Agreement) (Attachment A) with attached Schedule B-Requirements for Engineering Services (Attachment B). Any suggested changes to the Agreement must be identified with the proposal (as an attachment), although JVWCD reserves the right to reject any suggestions. No changes will be considered after the proposal due date.

Award

Water / Sewer

$1,674,788.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
62
Bidding Soon
1,025
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

August 14, 2025

Project location map

State St, Murray, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.