Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 30, 2025 at 8:00 PM
Updated July 17, 2025
This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.
Manitoba Hydro is seeking a Construction Manager Services to engage in the renovation and expansion of a modern 800 m² Fitness Facility to support employee wellness at Manitoba Hydro Place (360 Portage). This renovation project will include an expansion of the existing fitness area to include studio space, self-service resistance and cardio training, and modifications of the existing locker room facility. Manitoba Hydro would like to leverage the Construction Manager at Risk project delivery model to meet the following high-level goals for the work: Cost efficiency: leverage a design-to-budget approach and strong engagement during the design phase by the Construction Manager Expedited schedule: constructability reviews, pre-ordering of long lead-time items, and sequential tendering of subtrades to optimize project schedule Quality of space: high quality end product that optimizes life-cycle investments Sustainability The right Construction Manager partner for this project will be highly collaborative and propose innovative methods during the pre-construction and construction phase to achieve excellent results. Tender Posted to MERX: July 18, 2026; Tender Closing: August 1, 2026 This notice of intended procurement is for information purposes only. Please watch MERX for further information regarding solicitation 043493. If you are interested in this future opportunity, please contact Ievgen Zinchenko at: izinchenko@hydro.mb.ca Question Acceptance Deadline: 2025/07/16 12:00:00 AM CDT
Post-Bid
Municipal
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2025
November 17, 2025
360 Portage Ave, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Jul 18 2025
Culvert Installation Oak Bluff Drain at Road 50NE (N 07-09-2E) and at Road 6E (W 18-09-2E) - 5829768
Winnipeg, MB
Bid Date: Jul 10 2025
Winnipeg, MB
Bid Date: Jul 31 2025
Winnipeg, MB
Bid Date: Jul 11 2025
Winnipeg, MB
Bid Date: Jul 24 2025
Winnipeg, MB
Bid Date: Aug 21 2025
Winnipeg, MB
--
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Jul 23 2025
Winnipeg, MB
Bid Date: Jul 15 2025
Winnipeg, MB
Bid Date: Jul 17 2025
Winnipeg, MB
Bid Date: Jul 18 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
