BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated July 24, 2025

Site work and paving for a mixed-use development in Fort Erie, Ontario. Completed plans call for site work for a bridge / tunnel; playground / park / athletic field; road / highway; and for paving for a road / highway.

The contractor will be responsible for the full scope of services required for the Lions Sugarbowl Bandshell Site work. This includes the supply and installation of concrete pier footings, a concrete pad, electrical work, asphalt pathways and culvert installation. The Contractor shall coordinate schedules with the Bandshell Installer. The Construction must follow the following schedule sequence: 1. Concrete Pier Footing Installation (completed by August 15th) 2. Bandshell Installation (by others) 3. Concrete Pad 4. Asphalt Pathway The Town of Fort Erie will provide the contractor with the following: 1. Geotechnical Report 2. Building Permit 3. AutoCad file for layout Question Deadline 07/08/2025 at 2:00 PM ET Any questions about this bid electronically. The Corporation of Town of Fort Erie may post responses here or may issue an addendum responding to your questions. Documents can be obtained from https://www.biddingo.com/forterie/bid/1/11003138/40588428/verification

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - City

Paving, Site Work

8

13

2

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
605
Active Projects
347
Bidding Soon
4,483
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 1, 2025

Project location map

100 Gilmore Rd, Fort Erie, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.