BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Site work for a civil project in Apex, North Carolina. Completed plans call for site work for a water / sewer project.

Project has been Rebid A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following 1. The Project consists of the replacement of the existing septic system at three park facilities, Family Campground Loop A, Family Campground Loop C, and the Family Campground Dump Station. Additionally the proposed work includes the replacement/realignment of the water distribution system servicing the Group Campground and an extension of that distribution system to the existing boathouse. B. Type of Contract: 1. Project will be constructed under a single prime contract. The Project consists of the dredging, repair, and maintenance of wastewater lagoons at three Park Access Areas: Poplar Point, Parkers Creek, and Vista Point; as well as the replacement of the above ground irrigation system and maintenance thinning and replanting of vegetative field cover, plus all other work indicated in the contract documents. NCDNCR reserves the unqualified right to reject any and all proposals.

Post-Bid

Water / Sewer

$600,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
226
Active Projects
137
Bidding Soon
1,646
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 29, 2025

Project location map

280 State Park Rd, Apex, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.