BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 1, 2025 at 8:00 PM

Updated July 11, 2025

Site work and outdoor lighting for a water / sewer project in Shelton, Connecticut. Completed plans call for site work for a water / sewer project.

Bid for the Installation of Air Sparge and Soil Vapor Extraction Wells Drilling work will consist of installation of approximately 20, two-inch diameter PVC air sparge wells and 20, four-inch diameter PVC soil vapor extraction wells to remediate chlorinated solvents in overburden soil and groundwater beneath the site. Overburden material consists of sand and some gravel/cobbles. Overburden groundwater is located approximately 12.5 to 14 feet below grade. Any questions concerning the project named above should be directed to Ricardo Rodriguez from the Naugatuck Valley Council of Governments (NVCOG) at rrodriguez@nvcogct.gov and Paul Natoli from Arcadis U.S., Inc., at paul.natoli@arcadis.com. Air Sparge (AS) Wells Approximately 20, two-inch diameter PVC overburden wells installed to 32 feet below grade information and construction as follows: o The wells will be constructed of a 2-foot section of 0.010-inch slot screen and associated riser material to above grade. A two-foot sump is required at the bottom of the well. o Well screen to be backfilled 2-feet above the top of screen with appropriate-sized sand for slot width followed by 3-feet of "choker" sand (finer-grained sand). o Install a 2-foot bentonite seal above the sand pack material and grout to four feet below grade. o A well protector is not required since these wells will be piped underground to the remediation system. An expansion plug or PVC cap is required on top of the well to cover. Soil Vapor Extraction (SVE) Wells Approximately 20, four-inch diameter PVC overburden wells installed to 15 feet below grade, information and construction as follows: o The wells will be constructed of a 10-foot section of 0.020-inch slot screen and associated riser material to above grade. A two-foot sump is required at the bottom of the well. o Well screen to be backfilled 1-foot above the top of screen with appropriate-sized sand for slot width. o Install a 1 to 2-foot bentonite seal above the sand pack material. o A well protector is not required since these wells will be piped underground to the remediation system. An expansion plug or PVC cap is required on top of the well to cover.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
863
Active Projects
383
Bidding Soon
5,984
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 11, 2025

Project location map

125 Canal St E, Shelton, CT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.