Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 2, 2025 at 8:00 PM
Updated July 3, 2025
Site work for a playground / park / athletic field in Erie, Colorado. Conceptual plans call for site work for a playground / park / athletic field.
Reference Number 0000391047 Bid Intent Not Available Provide design services, demolition and removal of existing equipment, and installation of new play equipment and surfacing at Reliance Park. Reliance Park is located at 900 County Road 1 1/2, Erie, CO 80516. It lies north of the Old Town neighborhood and south of the Northridge subdivision. The existing playground footprint includes approximately 2,332 SF of level play area, surrounded by a concrete curb and surfaced with approximately 1,454 SF of engineered wood fiber (EWF) and 878 SF of poured-in-place (PIP) surfacing. Reliance Park is named after Reliance Mine. This mine was in operation from 1903-1907 in the area south of Rue De Trust between Weld County Rd 3 and Weld County Rd. 5. Additional amenities at the park include a ballfield, The Boneyard (dog park), walking trails, drinking fountain, and portable restrooms. The estimated total budget for design, demolition and removal of existing equipment, and installation of new play equipment and surfacing is $350,000. Town of Erie playgrounds must: Excite, challenge, and engage users of all ages and abilities Offer developmentally appropriate challenges and creative, varied play experiences Encourage intergenerational interaction by providing features that appeal to caregivers, older youth, and young children alike Serve as unique neighborhood landmarks, with a cohesive, context-sensitive aesthetic and quality materials Remain visually appealing and fully functional for a minimum of 15 years All equipment must be made of durable, high-quality materials, with warranties and service terms supporting low-cost, hassle-free maintenance. All answers to questions received will be sent in a formal addendum (if needed), by July 18, 2025. A pre-proposal conference will not be held for this project. Buyer Preferences, Guidelines & Requirements General Requirements - Installation Required - Insurance Required Question Deadline 07/11/2025 at 5:00 PM MT Questions are submitted online Yes, All questions related to this bid should be submitted through the online.
Conceptual
Playgrounds / Parks / Athletic Fields
$350,000.00
Public - City
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2026
900 County Rd 1 1/2, Erie, CO
Related To This Project
Erie, CO
Bid Date: Oct 17 2025
Erie, CO
Bid Date: Nov 04 2021
Erie, CO
Bid Date: Dec 19 2025
Erie, CO
Bid Date: Aug 15 2025
Erie, CO
Bid Date: Aug 04 2025
Erie, CO
Bid Date: Jul 01 2025
Erie, CO
Bid Date: Jun 02 2025
Erie, CO
Bid Date: Jun 13 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
