BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work and paving for a road / highway in Bozeman, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of August 7, 2025 project was awarded to CK May Excavating, Inc in the amount of $278,650.75 Gallatin County is requesting competitive sealed bids to repair cracks along the asphalt trails north and south of Huffine Lane from Shedhorn Drive to Cobb Hill Road and then complete an asphalt overlay of the repaired trails. For further information concerning this project please contact Chase Eaton, PE at Sanbell, 106 East Babcock Street, Suite L1, Bozeman, MT 59715, or by telephone at 406-384-6494. Specifically, the project includes the following components: SCHEDULE 1: PAVEMENT REPAIR AND OVERLAY Repair cracks along the asphalt trails north and south of Huffine Lane from Shedhorn Drive to Cobb Hill Road and then completing an asphalt overlay of the repaired trails. The work will be completed within 90 calendar days after the notice to proceed date. The substantial completion and open to traffic date is November 1, 2025. The final completion and closeout punch list date shall be no later than November 15, 2025. CONTRACTOR and any of the CONTRACTOR'S subcontractors bidding on this project will be required to be registered with the Montana Department of Labor and Industry (DLI) prior to award. Forms for registration are available from the Department of Labor and Industry, P.O. Box 8011, 1805 Prospect, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. All laborers and mechanics employed by the CONTRACTOR or subcontractors in performance of the work shall be paid wages at rates as may be required by law in Gallatin County and by Federal and State laws. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Each bid or proposal must be accompanied by a Certified Check, Cashier's Check, or Bid Bond payable to Gallatin County Treasurer, in an amount not less than ten percent (10%) of the total amount of the bid. The successful BIDDER shall furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance as required shall be provided by the successful BIDDER(s) and a certificate(s) of that insurance shall be provided to Gallatin County prior to starting work. The right is reserved to reject any or all proposals received, to waive informalities, to postpone the award of the contract for a period of not to exceed ninety (90) days, and to accept the lowest responsive and responsible bid which is in the best interest of the OWNER. Gallatin County is an Equal Opportunity Employer.

Award

Roads / Highways

$278,651.00

Public - County

Paving, Site Work

32

10

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
158
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 11, 2025

Project location map

Huffine Ln, Bozeman, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.