Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 18, 2025 at 8:00 PM
Updated September 19, 2025
Site work and renovation of a civil project in Oakland, Illinois. Completed plans call for site work for a water / sewer project; and for the renovation of a water / sewer project.
Construct renovations of the existing municipal wastewater treatment plant located east of Coles County Road 2350E in unincorporated Coles County. Renovations will include the following: lagoon sludge removal and its land application across the road to the north in the non-wetlands portion of a farm field; sand filter construction, aeration installation; and all related appurtenances. A certified check or bank draft, payable to the order of City of Oakland, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. Bids may be held by the City of Oakland for a period not to exceed 30 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. The City of Oakland reserves the right to reject any or all Bids or to waive any informalities in the bidding The project consists of renovations to the existing wastewater treatment plant including sludge removal, sand filter construction, aeration installation and all appurtenances and related costs In the City of Oakland. 1. The proposed work consists of the furnishing of all labor, material, tools, equipment and services necessary for the rehabilitation of the existing treatment facility including all incidental work as shown on the plans and as herein specified. The work includes, but is not limited to, lagoon cleaning, electrical service work, aeration removal, aeration installation, SCADA installation, lift station improvements and other miscellaneous items of work. 2. The Contractor shall be responsible to include the cost for all work in each bid line item, as shown on the Bid Form. The Contractor shall also coordinate with their suppliers so all items listed are being supplied and installed to make an operable system.
Award
Water / Sewer
$1,497,212.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2025
August 27, 2025
N Co Rd 2350 E, Oakland, IL
Related To This Project
Oakland, IL
Bid Date: Nov 14 2025
Oakland, IL
--
Oakland, IL
Bid Date: Apr 25 2025
Oakland, IL
Bid Date: Apr 28 2025
Oakland, IL
Bid Date: Feb 28 2025
Oakland, IL
Bid Date: Aug 23 2024
Oakland, IL
Bid Date: Jan 12 2024
Oakland, IL
Bid Date: Jan 18 2022
Oakland, IL
Bid Date: May 30 2023
Oakland, IL
Bid Date: Jun 30 2022
Oakland, IL
Bid Date: Apr 04 2022
Hinsdale, IL
--
Chicago, IL
--
Mundelein, IL
Bid Date: Jul 17 2025
Naperville, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
