BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work and paving for a bridge / tunnel in Miami, Oklahoma. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

County: Ottawa Description: County Road 378, Over Downing Creek Location: County Roads (NS 4520 RD/EW 120 RD) From the Intersection of US-59, Extend South and East Near Miami Project length - 3.166 miles DBE Goal: 19.5% ODOT Call #520 This work consists of providing electronic data for material weight tickets of all bituminous material delivered to the project. This work also consists of placing an identifying vehicle number on the driver side and the passenger or rear sides of the delivery vehicle. These provisions do not preclude or dismiss any requirement for paper tickets required by the Standard Specifications or other rules and regulations. The American Burying Beetle (ABB) is listed by the U.S. Fish and Wildlife Service (USFWS) as a threatened species. As such, the ABB is protected under the Endangered Species Act (the Act), which prohibits any take that may interfere with the survival and recovery of the species. A final rule under the authority of section 4(d) of the Act provides measures that are necessary and advisable to provide for the conservation of the American burying beetle. The 4(d) rule identifies certain activities that are excepted from take prohibitions, which differs by geographic area. FHWA delegatesthe ODOT Natural Resources Program biologiststo assessimpactsto species and to determine when application of the 4(d) rule for ABB is appropriate. Artificial lighting is known to disturb nocturnal insects' essential activities, including migration, dispersal, foraging, mating, and reproduction. For any federally funded projects let through ODOT within suitable ABB habitat, measures will be taken to minimize use of artificial lighting during construction. If night construction is necessary, direct light will be shielded to the work area and light will be prevented from projecting upwards. This work consists of providing and placing reflectorized and non-reflectorized plural-component pavement markings on asphalt concrete (AC) and portland cement concrete (PCC) pavement surfaces. Plural-component pavement markings includes multiple varieties of both fast setting and slow setting hybridized epoxies, modified urethanes/polyacrylates, methylmethacrylates(MMA), polyurea, or any other applicable plural-component materials approved by the Department.

Award

Bridges / Tunnels

$6,583,881.00

Public - State/Provincial

Paving, Site Work

324

6

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
121
Bidding Soon
1,188
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 8, 2025

Project location map

Multiple Locations, Miami, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.