BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 12, 2025

Demolition and site work for a municipal facility in Yogo Crossing, Montana. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

Small, minority, and women s businesses and labor surplus area firms are encouraged to participate. Bidders shall make positive efforts to use small and minority-owned businesses and comply with NCGS 143-128. Question Deadline: Thursday, July 24, 2025 , Question sent to Smith Gardner, Inc. 14 N. Boylan Avenue Raleigh, North Carolina 27603 Attn.: W. Michael Brinchek, P.E. Phone Number: (919] 828-0577 Email: mikeBsmithqardnerinc.com LCID and AREA 2 C&D LANDFILL CONSTRUCTION: Includes construction of an approximately 5.1 acre Land Clearing and Inert Debris (LCID) Landfill unit, an approximately 19.1 acre Construction & Demolition (C&D) landfill unit, an approximate 8.5 acre Soil Borrow Area, and related earthwork and drainage structures. Projectgenerally includes construction ofan approximately5.1-acre Land Clearing and Inert Debris (LCID) landfill unit, an approximately 19.1-acre Construction & Demolition (C&D) landfill unit, an approximate 8.5-acre Soil BorrowArea, with related earthwork, roadways, and drainage structures. An area ofArchaeological Significance is locatedeast ofthe C&D work limits. The Contractor willnot be allowed to encroach on the area shown. itis anticipated embankment materials from the LCID Landfill andSoil Borrow area willprovide sufficient material for construction ofthe C&D Landfill Unit. Excavated embankment not used as part ofthe project will be stockpilednorth of the C&D access roadin Soil BorrowArea No. 1 (see existing conditions). An access roadbetween the LCID Landfill unit and the C&D Landfill unit will be used fortransportation ofmaterial between projectphases to limitimpacts to site operations.

Award

Municipal

$1,568,345.00

Public - County

Demolition, Site Work

19

17

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
3
Active Projects
1
Bidding Soon
31
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2025

August 28, 2025

Project location map

Multiple Locations, Yogo Crossing, MT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.