BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 24, 2025 at 8:00 PM

Updated October 25, 2025

Site work for a water / sewer project in Muskegon, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000399627 To select a qualified firm to pump/transport and apply the sludge from Cell #4 into drying beds located on-site. Question Acceptance Deadline 10/08/2025 05:00 PM EDT Questions are submitted online Yes SCOPE OF WORK & PROJECT SPECIFICATIONS 1. Project Information a. Cell #4 has an approximate surface area of 20 acres. Wastewater flow was diverted from this cell in May 2019, and the sludge has been allowed to stabilize since then. The County also estimates that approximately 750 dry tons of waste inert soil was also disposed of in this cell. All contents of Cell #4 must be removed from the cell including solids and water. A bathymetric survey was performed in August 2025 and the report can be found in Appendix A. b. Record drawings for Cell #4 are provided in Appendix B. c. Cell #4 will be considered clean when the amount of sludge left cannot be removed without damage to the existing soil cement bottom, able to see the bottom of the Cell, and any material that is able to be picked up by the equipment used, has been. The project completion is not dependent on removal of the sludge from the drying beds.

Post-Bid

Water / Sewer

$200,000.00

Public - County

Site Work

14

5

4

4

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
93
Bidding Soon
927
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

November 24, 2025

Project location map

698 N Maple Island Rd, Muskegon, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.