Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 16, 2025
Renovation of a municipal facility in Franconia, New Hampshire. Completed plans call for the renovation of a municipal facility.
Part A - Snowbase Compressor Replacement 1. Supply and install a new System Air Compressor ( or similar) with the following specifications: o Same as current size-gallon tank (vertical or horizontal configuration acceptable) o Air-cooled aftercooler o Low oil stop control o Electronic tank drain o Vibration isolation o 3-phase motor o Minimum 25 HP motor o Ability to reach 175 PSI 2. Install and verify full operational status of the new compressor. Part B - Peabody Compressor Replacement 3. Supply and install a new System Air Compressor (or similar) with the following specifications: o 80-gallon vertical tank o Ability to reach 175 PSI o 3-phase motor o Low oil stop control o Electronic tank drain o Air-cooled aftercooler o Vibration isolation appropriate for nearby vibration-sensitive equipment 4. Install and verify full operational status of the new compressor, including proper plumbing and integration with the existing air dryer. 5. Service and verify operational condition of the existing air dryer at the Peabody location. Remove and replace if necessary. Part C - Snowbase Centac Compressor Stage Service/Rehabilitation 6. Take the existing Centac compressor offline and safely isolate it. 7. Remove, clean, and/or replace stage 1 and stage 2 components. 8. Disassemble unit, pressure wash, and soak necessary parts. 9. Reassemble using new gaskets, seals, and bearings. 10. Pressure test and visually inspect the cooler for wear; repair or replace components as needed. 11. Verify proper operational status and correct operating temperature after reassembly. 10/1/2025 Target Implementation of Contract Prior to bidding, it is each Vendor's responsibility to become thoroughly familiar with the sites of the intended service, to determine everything necessary to accomplish the services. Failure of the Vendor to make a site visit does not relieve the Vendor of responsibility to fully understand what is necessary to accomplish a successful and complete annual maintenance agreement. Cannon Mountain Ski Area is requesting the replacement of two existing air compressorsone at the Snowbase facility and one at the Peabody compressor buildingwith new units that meet or exceed current production levels. The new compressors must fit within the existing width and length constraints of each site, with height limited only by ceiling clearance. Installation and full operation are required at least four weeks prior to the snowmaking season. Additionally, bidders must be able to provide regional service and readily available parts to ensure ongoing operational reliability. The State reserves the right to reject any or all bids or any part thereof and add/delete items/locations to the contract. All award(s) shall be, in the form of a State of New Hampshire Contract. Question Deadline 07/11/2025 at 2:00 PM ET Any questions, clarifications, and/or requested changes shall be submitted by an individual authorized to commit their organization to the Terms and Conditions of this bid and shall be received in writing
Post-Bid
Municipal
$200,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2025
October 1, 2025
Multiple Locations, Franconia, NH
Related To This Project
Franconia, NH
Bid Date: Aug 29 2025
Franconia, NH
Bid Date: Sep 26 2025
Franconia, NH
--
Franconia, NH
Bid Date: Feb 27 2025
Franconia, NH
Bid Date: Feb 28 2025
Franconia, NH
Bid Date: Feb 28 2025
Franconia, NH
Bid Date: Nov 06 2025
Franconia, NH
Bid Date: Jul 01 2024
Franconia, NH
Bid Date: Dec 06 2023
Franconia, NH
Bid Date: Jan 17 2024
Franconia, NH
Bid Date: Nov 18 2021
Franconia, NH
Bid Date: Jul 13 2023
Franconia, NH
Bid Date: Feb 28 2025
Franconia, NH
Bid Date: May 15 2023
Franconia, NH
Bid Date: Aug 05 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
