Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Renovation of a municipal facility in Woodward, Iowa. Completed plans call for the renovation of a municipal facility.

WRC Birches Windows BP#01 Abatement - Low Bidder - Fligg Holdings dba Controlled Asbestos $173,800 - Awarded BP#02 Window - Low Bidder - Voss Services, Inc. $744,278 - Awarded The Iowa Department of Administrative Services will be receiving bids for replacing the windows at the Birches building at Woodward Resource Center, Woodward, Iowa 50276. Project Description: Replacing the windows at the Birches building. Location: Woodward Resource Center 1251 334th Street, Woodward, Iowa 50276 The Iowa Department of Administrative Services anticipates construction to begin on August 25, 2025 and end on September 30, 2026. The Bid shall be accompanied by a Bid Security as set forth in the Instructions to Bidders in the amount of 5% of the total bid amount. Each bid shall be accompanied by a bid bond, cashier's check or a certified check drawn upon a solvent bank chartered under the laws of the United States of America. The Iowa Department of Administrative Services reserves the right to reject any and all bids, and to waive irregularities and to accept a bid that is deemed in the best interest of the State of Iowa. Questions must be submitted by 10:00 am, July 14, 2025, to the Issuing Officer. For further information regarding this project contact: Michael Bradbury - Issuing Officer Phone: (515) 823-9327 The Contractor's Work includes all labor, supervision, materials, equipment, services, supplies, tools, facilities, transportation, hoisting, storage, receiving, licenses, inspections, certifications, overhead, profit, or other items required or reasonably inferable to properly and timely perform and complete all work and services to be performed by the Contractor pursuant to this Agreement. Unless specifically stated otherwise, incidental work required to accomplish the work of this Bid Package shall be included the bid. This would include, but not be limited to, temporary facilities, protection of the work, security of equipment, materials, and work in progress, etc. Contractor's Work shall be performed in accordance with the Drawings, Specification Divisions 00 and 01, and Specification sections applicable to each Contractor's scope. Contractor is responsible for all labor and equipment to unload, account for all material delivered, stock, and delivery for this scope of work. Storage and delivery of materials and equipment at the Site shall be permitted only to the extent approved in advance by the Construction Manager, and if anything so stored obstructs the progress of any portion of the work, it shall be promptly removed or relocated by the Contractor without reimbursement. Contractor is responsible for any sidewalks or paving to be kept in same condition. If broken or cracked Contractor is to repair. On site supervision by Prime Contractor at all times work by that contractor or their subcontractors/suppliers is taking place. Provide all temporary facilities required for this scope of work including trailer, trailer power, telephone, secured storage, temporary power for work, temporary and task lighting for work, etc. as determined necessary by Contractor. Coordinate location of trailers, material storage and utility lines with Construction Manager. Limited space is available, and permission to bring any such facility or excess materials on to the site shall be approved by the Construction Manager. 6. Contractor shall provide all equipment and tools for Contractor's own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner's operations, and at the discretion of the Construction Manager. 7. Protect adjacent existing building elements from damage from Scope of work. Repair existing building elements damaged during Contractor's Scope of work. 8. Contractors will need to plan on providing their own internet access if needed. 9. Each person working on site (excluding delivery drivers) shall attend a 30-minute Woodward Resource Center and Story Construction Co. safety orientation prior to site entry. Upon successful completion of the orientation, each person will receive a hard-hat sticker to identify successful completion. Each person must successfully complete the orientation prior to being allowed onsite to perform work. A 24-hour notice to the Construction Manager of the need for an orientation is required. 10. Each Contractor shall designate a representative to attend one 60-minute preconstruction meeting.

Award

Municipal

$918,078.00

Public - State/Provincial

Renovation

9

15

4

5

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
90
Bidding Soon
1,084
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2025

August 25, 2025

Project location map

1251 334th St, Woodward, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.