Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 1, 2025 at 8:00 PM
Updated September 4, 2025
Demolition, site work and addition to a military facility in Westmorland, California. Completed plans call for the addition of a military facility; for the demolition of a military facility; and for site work for a military facility.
The project involves the expansion of the Highway 86 Check Point Shelter Structure in accordance with the attached Statement of Work. The contractor shall provide construction services as outlined in the following documents: Attachment 1 - Statement of Work, Attachment 2 - Construction Price Proposal Form, and Attachment 3 - Wage Determination CA202500002 for Imperial County dated 08/22/2025. The estimated price range for the construction is between $200,000 and $300,000, as defined under FAR 36.204. Proposals, including pricing, must be submitted via email to the Contracting Officer by 10:00 AM ET on September 3, 2025. Location: Highway 86 Check Point, Imperial County, California Mailing Address: Highway 86 Checkpoint, CA-86, Imperial, CA 92251 Questions regarding the solicitation package may be addressed to the Contracting Officer, Paul Barrett, via email paul.barrett@cbp.dhs.gov. Program Office POC (Imperial, CA) Jose Ramirez Mission Support Specialist jose.ramirez@cbp.dhs.gov Submission of proposals shall be directed to the Contracting Officer via email ONLY. The solicitation documents will be released via www.SAM.gov. It is the intent that Indio Station procure contractor service to expand the existing shelter structure at the Highway 86 Checkpoint to fully include the existing temporary detention area and the secondary inspection area by acquiring the following services described below: A. Preparation of ground as needed, including demo and dispose of any existing concrete or gravel and level ground, grade, and compact dirt bottom B. Concrete: Install concrete footings, according to structure specification to support new structure, and 100-mile winds. C. Also, the lights locate it at the end of the existing canopy structure on both sides, the Contractor must relocate it to the front of the new addition structure. D. Metal Covering: Install a prefabricated metal covering and structure to match the existing covering and structure, with approximate dimensions of 30'x80'x30'. The installed covering structure will be tied into the existing canopy structure. E. Side Wall Improvements: Add wall coverings to cover pre-primary, extending coverings to the roof at an angle and add additional coverings to the west and east walls of the newly expanded structure, mirroring existing wall coverings on the existing structure. F. Painting: Paint any part of the newly installed structure as needed to match existing structure. G. The Contractor will need to attend a site visit to gather any other information they might need to complete final proposal to be submitted to the Contracting Officer. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$300,000.00
Public - Federal
Addition, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 3, 2025
October 3, 2025
3900 CA-86, Westmorland, CA
Related To This Project
Westmorland, CA
Bid Date: Oct 10 2025
Westmorland, CA
Bid Date: Dec 12 2025
Westmorland, CA
--
Westmorland, CA
Bid Date: Aug 22 2024
Westmorland, CA
Bid Date: Nov 15 2023
Westmorland, CA
Bid Date: Sep 18 2023
Westmorland, CA
Bid Date: Aug 31 2023
Westmorland, CA
Bid Date: Jul 25 2023
Westmorland, CA
Bid Date: Dec 06 2022
Santa Rosa, CA
Bid Date: Jul 29 2025
Newport Beach, CA
Bid Date: Jul 29 2025
Orange, CA
Bid Date: Jul 24 2025
Sacramento, CA
Bid Date: Jul 23 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
