BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 25, 2025 at 8:00 PM

Updated August 26, 2025

Renovation of a municipal facility in Mountain Home, Arkansas. Completed plans call for the renovation of a municipal facility.

**As of August 25th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** RFI Due Date:6/30/2025 @ 14:00 CT The work to be done consists of furnishing all labor (Davis-Bacon Act General Wage Rate Decision Number: AR20250046 dated 01/03/2025), materials, equipment, supervision of your work and insurances, and performing all work in strict accordance with the Contract Bid Documents for a New Aeration System (Phase 2) at the Norfork National Fish Hatchery (NFH). This project will involve the construction of water lines and pipe support structures to enable the installation of an aspirating degasser system. The work in this project includes the trades listed in the table below by CSI Divisions. This project consists of renovations to existing Norfork Hatchery Building and Raceways as described herein. The work consists of replacement of existing oxygenation systems for both the exterior raceways and the interior raceways located in the hatchery building incubator room. Exterior work consists of bypassing and replacement with new "packed column" oxygenation system complete. The hatchery building working consist of removal of existing oxygenation system and replacement with new "packed column" oxygenation system. No work that would cause a water outage is to be done during the months of September through December. The Phase 2 scope of work involves the construction of water lines and pipe support structures to enable the installation of an aspirating degasser system, provided by the U.S. Department of Interior (DOI). The aeration columns (degassers) will be installed at three critical locations within the hatchery: the outside raceways, the main hatchery raceways, and the egg room. The purpose of this system is to improve water quality by removing excess gases, ensuring optimal conditions for fish health and survival. The Contractor will be responsible for all necessary civil and mechanical work to support the system, including construction of piping, supports, and connections to existing infrastructure. Upon completion, the system must be fully operational and integrated to meet DOI performance standards. The Contractor is required to perform field investigations as needed to evaluate and document the existing site conditions. The work entails the construction of building components and associated utilities, in addition to procuring and supplying all necessary materials, equipment, services, and labor as reasonably inferred from the Statement of Work. The Contractor is obliged to verify all quantities and measurements. Construction of the new oxygenation system to install aspirating degassers in according to the provided drawings and specifications. The project involves pipe installation to by-pass existing aeration buildings. The installation of FWS provide Aspirating degasser units at outside raceways and hatchery and egg room. Questions Due Date: 06/30/2025@12:00 PM Eastern Time (ET) Project Magnitude: Between $1M and $5M Solicitation Contact Information: joann_mallory@fws.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Municipal

$5,000,000.00

Public - Federal

Renovation

28

13

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
25
Bidding Soon
383
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

September 15, 2025

Project location map

1414 State Hwy 177, Mountain Home, AR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.