BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 20, 2025 at 8:00 PM

Updated September 21, 2025

Site work for a water / sewer project in Fort Pierce, Florida. Completed plans call for site work for a water / sewer project.

Pre-Bid Conference will be held virtually on Thursday, July 30, 2025, at 10:00 AM, EDT. Please utilize the link and call information provided below to join the TEAMS Meeting: HTTPS://WWW.MICROSOFT.COM/EN-US/MICROSOFT-TEAMS/JOIN-A-MEETING MEETING ID: 993 192 956 204 / PASSCODE: EA3Em3a5 DIAL IN BY PHONE: +1 503-207-9433 / PHONE CONFERENCE ID: 339 001 328# Project work includes construction of a beach berm along approximately 7,000 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-41. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty offloading area. Work also includes but is not limited to environmental species monitoring, sea turtle trawling (hopper dredges only), turbidity monitoring, beach tilling, beach fill quality control, screening, MEC construction support, and vibration control and monitoring. The project work is subdivided into a base and one option as indicated on the drawings. The Invitation for Bid (IFB) will be issued on or about 18 July 2025 and bids will be due on or about 19 August 2025. NAICS Code 237990, Dredging and Surface Cleanup Activities. The Small Business Standard is $37 million The Magnitude of construction is between $10,000,000.00 and $25,000,000.00. The period of performance associated with this requirement is: complete the entire work ready for use not later than 15 May 2026 for Area B and be off the beach, 30 May 2026 for Area A and be off the beach, and 30 June 2026 for the entire contract work. The contractor shall commence work within 60 calendar days of receipt of the Notice to Proceed (NTP). THIS PROCUREMENT IS AN UNRESTRICTED REQUIREMENT. NOTE: U.S. COAST GUARD CERTIFIED DREDGE EQUIPMENT IS REQUIRED TO COMPLETE THE WORK. Question Deadline 08/08/2025 at 5:00 PM ET Technical inquiries and questions relating to this solicitation are to be submitted via online *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$15,006,510.00

Public - Federal

Site Work

16

17

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
91
Bidding Soon
1,253
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

October 17, 2025

Project location map

St. Lucie County, Fort Pierce, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.