BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work and new construction of a mixed-use development in Mendota, California. Completed plans call for the construction of a 12,249-square-foot educational facility; and for site work for a educational facility.

MUSD District Office. Questions regarding interpretation of drawings and specifications shall be clarified by the ARCHITECT; provided, however, that in the event ARCHITECT determines that CONTRACTORS requests for information (RFI's) are not justified or do not reflect adequate competent supervision, coordination, and / or knowledge by the CONTRACTOR or his/her Subcontractors, CONTRACTOR shall be required to pay ARCHITECT'S reasonable and customary fees in processing and responding to such requests. Should the CONTRACTOR commence work or any part thereof without seeking clarification, and/or performing its own coordination obligations, the CONTRACTOR waives any claim for extra work or damages as a result of any ambiguity, conflict or lack of information WORK UNDER OTHER CONTRACTS A. General Requirements: 1. Work under separate contracts will occur throughout the duration of the project. The work being installed under separate contracts will occur around adjacent to the Contract project site. 2. Contractor shall coordinate its work with the work under separate Contracts and shall cooperate with the Contractors of these separate Contracts as they occur. 3. Should the Contractor damage and/or otherwise alter work installed under separate contracts, the Contractor is responsible for the repair and/or correction of installed work. 4. Prior to the installation of the Work, coordinate the work installed or to be installed by separate contracts relative to this project scope of work. B. Work by Owner: 1. General: Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this contract or work by Owner. Coordinate the work of this Contract with work performed by Owner. 2. Concurrent Work: Owner will perform the following construction operations at Project site. Those operations will be constructed simultaneously with work under this Contract.

Award

Educational

$15,637,000.00

Public - City

New Construction, Site Work

195

29

62

3

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
68
Bidding Soon
716
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2025

September 2, 2025

Project location map

McCabe Ave, Mendota, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.