BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 1, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Fort Collins, Colorado. Working plans call for the renovation of a educational facility.

As of May 1, 2026, a design-builder has been selected and the project is in pre-construction/negotiated status. Design is expected to be completed in May 2027. Phase I (one residence hall and a pavilion) is scheduled for construction from June 2027 through June 2028, followed by Phase II (one residence hall) from June 2028 through June 2029, with final project completion anticipated in August 2029. *The closed solicitation has been included below for reference: Reference Number 0000392044 Bid Intent Not Available Colorado State University (CSU), is soliciting the submittal of proposals from Design/Build (D/B) Entities to design and construct the project as described herein. The project will include removal of the existing VRF HVAC system with the intent of replacing the HVAC system with a more traditional 4-pipe fan coil system, new HVAC controls, and associated interior, electrical, and structural scopes of work required to replace the existing HVAC system. The project shall also include resident room and bathroom light fixture replacements and associated code-required electrical upgrades (i.e., occupancy sensors, controls, EM lighting, exit signs, etc.) The project will include removal of the existing HVAC system with the intent of replacing the HVAC system with a more traditional 4-pipe fan coil system, new HVAC controls, and associated interior, electrical, and structural scopes of work required to replace the existing HVAC system. The project shall also include resident room and bathroom light fixture replacements and associated code-required electrical upgrades (i.e., occupancy sensors, controls, EM lighting, exit signs, etc.) An HVAC Upgrade Study (Appendix E2) was completed in 2025 and includes various options for the new HVAC system. CSU is primarily interested in exploring the Geothermal plant and the Air Cooled Chiller + Electric Boiler (ACC+EB) options during the program verification phase. For the purposes of the procurement and the associated cost proposal, the anticipated Fixed Limit of Design and Construction (FLODC) has been established at: $37M. Question Deadline 07/16/2025 at 12:00 PM MT Questions are submitted online No The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information.

Pre-Construction/Negotiated

Educational

$37,000,000.00

Public - City

Renovation

36

20

2

8

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
126
Bidding Soon
1,642
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2025

June 1, 2027

Project location map

To Be Determined, Fort Collins, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.