BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Fort Collins, Colorado. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000392065 Purchase Type One Time Only- Delivery Date:09/22/2025 Includes the demolition and replacement of the existing Dale Creek Structure (LR45E-0.2-S287). The new structure will consist of a three-cell concrete box culvert within the existing structure's footprint. The placement of the new structure will also include various related construction activities, e.g., excavation, grading, dewatering, erosion control and stabilization, placement of riprap, fencing, and other miscellaneous items. The structure is located on LCR 45E, off US287 near the Virginia Dale community. All bidders shall be experienced highway contractors and must be experienced in highway bridge construction and in the use of the Colorado Department of Transportation's Specifications for Road and Bridge Construction. Larimer County may require the apparent low bidder to submit a Statement of Qualifications prior to award. The County reserves the right to reject a bid from a Contractor considered unqualified. Question Deadline 07/25/2025 at 10:00 AM MT Questions are submitted online No, All questions regarding this solicitation must be emailed to the Contact Person identified below. If you do not receive a confirmation email of receipt, please call the Contact Person to verify receipt of your questions. No questions will be accepted after the date and time referenced above. All questions received will be answered via Addendum only. Purchasing Agent Christal Bateman, batemach@co.larimer.co.us, 970-498-5956 NOTE: Unauthorized contact with AVI or a County employee other than the Contact Person listed above or Purchasing Manager regarding this bid may result in disqualification of your bid. Each Bid must be accompanied by a Bid Guaranty consisting of a Bid Bond in the amount of five percent (5%) of the contractor's bid, without conditions, payable to Larimer County or your bid will be considered nonresponsive and your bid will be rejected. The sample Bid Bond included in these bid documents should be used. Bid Guaranties may be held until the contract is awarded, provided the time from bid opening to contract award does not exceed 30 days. Payment and Performance Bonds in the amount of 100 percent of the Award Vendor's Contract price must be supplied prior to any work beginning. It is understood that Larimer County reserves the right to reject any and/or all bids and to waive informalities and irregularities in bids, and to accept the bid that, in the opinion of Larimer County, is in the best interests of Larimer County.

Award

Bridges / Tunnels

$1,000,000.00

Public - County

Demolition, New Construction, Paving, Site Work

28

9

5

8

Subscribe For Documents

139 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
82
Bidding Soon
1,309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 22, 2025

Project location map

Dale Ct, Fort Collins, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.