Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 16, 2026 at 7:00 PM
Updated January 17, 2026
Renovation of an educational facility in Fort Collins, Colorado. Working plans call for the renovation of a educational facility.
As of January 16, 2026, a design/builder has been selected and this project is in the pre-construction/negotiated status. Constructio is anticipated to start in June 2027 and be completed in summer 2029. *The closed solicitation has been included below for reference: Reference Number 0000392044 Bid Intent Not Available Colorado State University (CSU), is soliciting the submittal of proposals from Design/Build (D/B) Entities to design and construct the project as described herein. The project will include removal of the existing VRF HVAC system with the intent of replacing the HVAC system with a more traditional 4-pipe fan coil system, new HVAC controls, and associated interior, electrical, and structural scopes of work required to replace the existing HVAC system. The project shall also include resident room and bathroom light fixture replacements and associated code-required electrical upgrades (i.e., occupancy sensors, controls, EM lighting, exit signs, etc.) The project will include removal of the existing HVAC system with the intent of replacing the HVAC system with a more traditional 4-pipe fan coil system, new HVAC controls, and associated interior, electrical, and structural scopes of work required to replace the existing HVAC system. The project shall also include resident room and bathroom light fixture replacements and associated code-required electrical upgrades (i.e., occupancy sensors, controls, EM lighting, exit signs, etc.) An HVAC Upgrade Study (Appendix E2) was completed in 2025 and includes various options for the new HVAC system. CSU is primarily interested in exploring the Geothermal plant and the Air Cooled Chiller + Electric Boiler (ACC+EB) options during the program verification phase. For the purposes of the procurement and the associated cost proposal, the anticipated Fixed Limit of Design and Construction (FLODC) has been established at: $37M. Question Deadline 07/16/2025 at 12:00 PM MT Questions are submitted online No The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information.
Pre-Construction/Negotiated
Educational
$37,000,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2025
June 1, 2027
To Be Determined, Fort Collins, CO
Related To This Project
Fort Collins, CO
Bid Date: Jul 30 2025
Fort Collins, CO
Bid Date: Aug 01 2025
Fort Collins, CO
Bid Date: Jul 18 2025
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Aug 12 2025
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Jul 31 2025
Fort Collins, CO
Bid Date: Jul 12 2025
Fort Collins, CO
--
Fort Collins, CO
--
Fort Collins, CO
Bid Date: Jul 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
