Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 9, 2025 at 8:00 PM
Updated August 10, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Shippenville, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This Project is the Bridge Replacement of the Existing Structure Carrying Sr 4029 (Paint Mills Road) Over Paint Creek With a New Single Span Steel Bridge and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route4029, Section 350, in Clarion County Paint Township From Approximately 150 Feet From the Start of the Existing Structure at Segment 0070 Offset 2049 to Approximately 400 Feet From the End of the Existing Structure at Segment 0080 Offset 0636. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 69.00% Pre-Bid Meeting: None Anticipated NTP: 09/22/2025 Wage Rates: Yes Required Completion: 10/16/2026 Prequalification Requirement: Yes State Type of Work: Bridge Replacement Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an addendum. The deadline for submitting questions is 72 hours before the let date and time. For emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Paint Mills Bridge - SR 4029 (Paint Mills Road) *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This is an ECMS project. All Addenda will be electronically posted.The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to obtain a visitor pass on the 5th Floor and to be escorted to the 7th Floor Contract Awards Room.
Bid Results
Bridges / Tunnels
$1,724,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
September 22, 2025
Paint Mills Rd, Shippenville, PA
Related To This Project
Shippenville, PA
--
Shippenville, PA
Bid Date: Apr 16 2025
Shippenville, PA
Bid Date: Apr 16 2025
Shippenville, PA
Bid Date: Jan 03 2025
Shippenville, PA
Bid Date: Mar 18 2025
Shippenville, PA
Bid Date: May 15 2024
Shippenville, PA
Bid Date: Apr 08 2024
Shippenville, PA
Bid Date: Apr 08 2024
Shippenville, PA
Bid Date: Apr 08 2024
Shippenville, PA
Bid Date: Feb 01 2024
Shippenville, PA
Bid Date: Jan 11 2024
Shippenville, PA
Bid Date: Feb 17 2022
Shippenville, PA
--
Shippenville, PA
Bid Date: Aug 21 2023
Shippenville, PA
Bid Date: Apr 19 2023
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
