BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work for a water / sewer project in Prospect, Kentucky. Completed plans call for site work for a water / sewer project.

Brief Scope: Louisville Water Company is requesting Bids for the furnishing of all labor, materials, tools, equipment and incidentals and performing all work required to construct complete in place and ready to operate the B.E. Payne WTP Plan Lime System Improvements Project. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Demolition and legal off-site disposal of two (2) existing lime makeup systems, each consisting of the following: a. Lime slaker tank/feeder. b. Main control panel. c. Air dryer. d. Air compressor. e. Lime slurry aging tank. f. Lime slurry recirculation pump. 2. Demolition and legal off-site disposal of slaker system control panels for lime softening basins. 3. Demolition and legal off-site disposal of existing lime dosing assemblies at lime softening basins. 4. Demolition and legal off-site disposal of piping, valves, wire, conduit and appurtenances related to the existing lime makeup systems. 5. Demolition and legal off-site disposal of existing soda ash equipment. 6. Installation of two (2) new lime makeup systems, each consisting of the following: a. Lime slaker tank/feeder/bin vibrator. b. Main control panel. c. Air dryer. (C)2025 CDM Smith 1409-295621 All Rights Reserved May 2025 B.E. Payne Water Treatment Plant Plan Summary Lime System Improvements Project 011000 - 3 Louisville, KY d. Air compressor. e. Lime slurry aging tank. f. Lime slurry recirculation pump. g. Piping, valves, and appurtenances. h. Instrumentation and controls. 7. Installation of two (2) fine grit classifiers with common grit conveyor and new dosing assemblies at the lime softening basins. 8. Construction of new concrete pad for support of the existing grit dumpster. 9. Performance test all new equipment, instrumentation and controls and other systems as specified herein. 10. Installation of new lime slurry feed piping from the Lime Softening Chemical Building to the lime softening basins. 11. Perform all concrete masonry, structural, electrical and metal work as required to complete the Work. 12. Perform all relocations of any existing yard piping and underground utilities as required to accommodate the new work as shown on Drawings and specified herein. 13. Perform all sitework as required to complete the project. 14. Provide project site security for the duration of the project. Security is the sole responsibility of Contractor. 15. Perform any demolition work necessary to execute the project, not mentioned above. B. Type of Contract: 1. Project will be constructed under a single prime contract. *The value for this project is based on a financial range of $5,000,001 - $10,000,000. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$5,016,412.00

Public - City

Site Work

48

27

19

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
165
Bidding Soon
1,895
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.