BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 11, 2025 at 8:00 PM

Updated August 12, 2025

Site work for a civil project in De Pere, Wisconsin. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The project consists of removing and replacing two 83" x 57" corrugated metal pipe arches 52 feet long with two new 83" x 57" by 52 feet long corrugated metal pipe arches. A. Contract "A-2025" 1. Construction of diversion channel 2. Installation of first culvert 3. Moving diversion channel to new culvert 4. Installation of second culvert 5. Rip rap and landscaping 6. Roadway surface A. Work under this section requires the Contractor to provide and maintain temporary and permanent erosion and sediment control. B. The Contractor shall provide erosion and sediment control in accordance with the Erosion Control Plan for the project. C. Dewatering shall be incidental to construction and shall follow WDNR Conservation Practice Standard 1061. D. The Contractor shall install erosion control measures including but not limited to: 1. Silt fence 2. Sediment logs (temp ditch checks) 3. Clear stone bags 4. Sediment traps and basins 5. Temporary seeding 6. Tracking pads 7. Temporary diversion ditches 8. Erosion mat 9. Rip rap 10. Inlet protection A. Work under this section includes: 1. Clearing, cutting and disposal of trees, brush, windfalls, logs, and other vegetation within the construction limits. 2. Removal of stumps, roots, brush stubble, and timber from within the construction limits. A. Work under this section shall include: 1. Site preparation work a. Clearing, grubbing, and disposal b. Stripping and stockpiling topsoil 2. Dewatering 3. Trenching, backfilling, and compacting 4. Obstruction removal 5. Sheeting and bracing 6. Supporting existing structures 7. Disposal of surplus material 8. Restoration A. This section includes constructing a crushed aggregate base for: 1. Roadways 2. Shouldering 3. Parking lots B. Aggregates from recycled material may not be used unless required as part of this project. This section includes the material requirements for aggregates and bituminous materials for utilization in binder and surface course pavements for light and medium duty streets and parking lots. Work under this section shall include: 1. Culvert pipe installation 2. Apron endwall installation 3. Restoration 4. Testing

Award

Bridges / Tunnels

$84,265.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
31
Bidding Soon
479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

August 1, 2025

Project location map

Multiple Locations, De Pere, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.