Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Site work and paving for a road / highway in Pepper Pike, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The following projects in accordance with the Plans and Specifications prepared for the City of Pepper Pike. Each bid must be made upon the Proposal form provided and must be accompanied with a bid bond for the full amount of the bid in favour of the City of Pepper Pike given by a surety company authorized to do business in the State of Ohio, or a certified check or cashier's check in the amount of ten percent (10%) of the amount bid but in no event less than One Hundred Dollars ($100.00). The amount of such bond or check to be paid to the City as stipulated for liquidated damages in the event that the successful bidder fails to enter into the contract under the terms of his/her bid within fourteen (14) days after being notified of the award of the contract to such bidder. The bond of an unsuccessful bidder shall forthwith be cancelled and the check of such bidder returned, or, in the event the check has been deposited the amount shall be returned. When a Contract is entered into, a Surety Bond satisfactory to the City in an amount equal to 100% of the total bid shall be furnished. No bidder may withdraw his/her proposal within 45 days after the opening thereof. Bidders must comply with the prevailing wage rates on Public Improvements in Cuyahoga County and the City of Pepper Pike, Ohio, as determined by the Ohio Department of Industrial Relations. Doc note: Additional sets of bid documents can also be ordered for an additional cost by online emailing seblue@seblueprint.com, calling 216-241-2250 or visiting an SE Blueprint location. The right is reserved to accept any bidder, to reject any or all bids, and to waive informalities should it be deemed to be in the best interest of the City of Pepper Pike to do so. Tree removal shall be coordinated with the City of Pepper Pike prior to removal. This shall include a site visit between the Contractor and a designated representative from the City to flag trees that are to be removed. No removal shall be performed until the flagging has been performed and verified by the City. All trees shall be removed from the site by the Contractor. Operations shall be confined to the areas noted on the plans or as directed by the Engineer. Clean backfill material shall be used to fill the voids left by tree removal. All areas shall be seeded and mulched as called out in the general conditions. The Contractor shall take all necessary precautions to avoid the need for the removal of trees while performing construction activities. This item includes the removal and disposal of trees and tree stumps over 12" caliper to 24" caliper as directed in the field by the Engineer. All work under this Item shall conform to ODOT 203 Excavation and Embankment. Topsoil shall be stripped prior to placement of suitable material. All excess excavated material shall be removed and disposed of off-site by the Contractor as part of this item. Estimated Earthwork Numbers Cut = 1150 CY* Fill = 85 CY*
Award
Roads / Highways
$847,188.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 18, 2025
August 18, 2025
Shaker Blvd, Pepper Pike, OH
Related To This Project
Pepper Pike, OH
Bid Date: Nov 12 2021
Pepper Pike, OH
Bid Date: May 17 2019
Pepper Pike, OH
Bid Date: Jun 20 2025
Pepper Pike, OH
Bid Date: May 02 2025
Pepper Pike, OH
Bid Date: Mar 06 2025
Pepper Pike, OH
Bid Date: Feb 14 2025
Pepper Pike, OH
Bid Date: Mar 11 2025
Pepper Pike, OH
Bid Date: Aug 23 2024
Pepper Pike, OH
Bid Date: Aug 02 2024
Pepper Pike, OH
Bid Date: Jul 19 2024
Pepper Pike, OH
Bid Date: Jul 19 2024
Pepper Pike, OH
Bid Date: Jul 25 2024
Pepper Pike, OH
Bid Date: May 17 2024
Pepper Pike, OH
Bid Date: Jul 17 2020
Pepper Pike, OH
Bid Date: Nov 27 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
