BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Site work for a civil project in Miami Beach, Florida. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

**As of October 30, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000392060 Question Deadline 08/01/2025 at 5:00 PM ET Questions are submitted online No, Questions are submitted online No, Questions will be allowed up to 10 days before the initial deadline for submittal of Bids. Questions must be directed to Julissaperez@miamibeachfl.gov, with a copy sent to the City Clerk rafaelgranado@miamibeachfl.gov. Bid Bond 5 % This project will include enhancements to the pedestrian bridge's substructure and superstructure. Elements of the bridge affected by the repairs are identified in the plans and specifications. Rebar replacement and concrete repairs are some of the main construction tasks. Regulatory agencies' permits and exemptions acquired: Miami-Dade County DRER: Class I Construction Permits acquired; US Army Corps of Engineers: No permit required correspondences; CMB Building Department: No permit required letters; and SFWMD: Environmental Resource General Permits acquired. Approvals to be obtained by Contractor: US Coast Guard: Construction Navigation Clearance, Miami-Dade County DRER: Class I Construction Permit - Notice of Commencement of Construction, and a CMB Public Works Right of Way Permit. Licensing Requirements. Bidder shall be State of Florida Certified General Contractor OR Miami Dade County Licensed General Contractor to be considered for award. Days for Substantial Completion: 140 days Days for Final Completion: 20 days Total Project Duration: 160 days Liquidated Damages: Failure to achieve Substantial Completion: $580.00/day, Failure to achieve Final Completion: $580.00/day

Bid Results

Bridges / Tunnels

$844,685.00

Public - City

Site Work

32

7

33

11

Subscribe For Documents

115 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
49
Active Projects
0
Bidding Soon
999
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2025

October 13, 2025

Project location map

Multiple Locations, Miami Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.