BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated August 29, 2025

Site work and outdoor lighting for a playground / park / athletic field in Bloomington, Indiana. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

The City of Bloomington Parks and Recreation Department ("Parks") is seeking quotes from qualified vendors for the purchase and installation of twenty-four (24) supplemental lighting fixtures and associated components within the Switchyard Park Pavilion. All quotes must be itemized and detailed. Lump sum or non-itemized quotes will not be considered. Late submissions will not be considered. It is the responsibility of the vendor to confirm receipt prior to the deadline. Contact the Buyer for confirmation if needed. Project Objective: To enhance lighting within the Switchyard Park Pavilion by installing supplemental light fixtures and associated controls. Required Equipment and Components Lighting Fixtures: 24x Linton LCALD8W100-B60UE-D10-T40-C80-STMJ6-FR (or approved equivalent) 0 Note: Equivalent substitutions must be clearly identified with a written explanation. Equipment: Vendor will provide scissor lift or other equipment necessary for work. Control System: Crestron dimming panel to be installed in the Pavilion Office. Installation Tasks Install twenty-four (24) light fixtures in designated interior areas. Install surface-mount conduit for fixture wiring. Install new dimmer switch. Install dimming cable to all fixtures. Ensure all installed lighting is fully operational upon project completion. WORK SCHEDULE Work must be scheduled and completed during one of the following windows in 2025 2026. The selected vendor will coordinate with the Buyer to confirm the specific project timeframe: October 27 October 31, 2025 November 10 November 14, 2025 December 15 December 19, 2025 December 29 January 2, 2026 January 5 January 9, 2026 January 12 January 16, 2026 January 19 January 23, 2026 January 26 January 30, 2026 Other windows may be negotiated during contract process. Contractor may submit invoice upon completion of the project. All invoices must reference the project name and be submitted in accordance with City of Bloomington billing procedures. Invoices should be submitted via email to Buyer. The City reserves the right to accept or reject any or all proposals. The award of contract is contingent upon successful negotiation of terms and formal approval by the Board of Park Commissioners. The City of Bloomington Parks and Recreation Department ("Parks") is seeking quotes from qualified vendors for the purchase and installation of twenty-four (24) supplemental lighting fixtures and associated components within the Switchyard Park Pavilion. All quotes must be itemized and detailed. Lump sum or non-itemized quotes will not be considered. Project Objective: To enhance lighting within the Switchyard Park Pavilion by installing supplemental light fixtures and associated controls. Required Equipment and Components Lighting Fixtures: 24x Linton LCALD8W100-B60UE-D10-T40-C80-STMJ6-FR (or approved equivalent) Note: Equivalent substitutions must be clearly identified with a written explanation. Equipment: Vendor will provide scissor lift or other equipment necessary for work. Control System: Crestron dimming panel to be installed in the Pavilion Office. For questions or to confirm receipt of your proposal, please contact Hsiung Marler - marlerh@bloomington.in.gov | (812) 349-3769 Anticipated Award Date: September 25, 2025

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
79
Bidding Soon
1,413
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

September 3, 2025

Project location map

1601 S Rogers St, Bloomington, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.