Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2025 at 8:00 PM
Updated August 16, 2025
Renovation of a municipal facility in Charleston, West Virginia. Completed plans call for the renovation of a 6,410-square-foot municipal facility.
The Vendor shall furnish all materials, labor, and equipment necessary to complete all Construction Services. The Vendor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction Services. even if such incidental work is not explicitly included in these Specifications. Vendors may submit questions relating to this Solicitation to the City of Charleston's Purchasing Director. Questions must be submitted in writing. All questions must be submitted on or before the date listed below to bids@cityofcharleston.org. A written response will be published in a Solicitation addendum if a response is possible and appropriate. Nonwritten discussions, conversations, or questions and answers regarding this Solicitation are preliminary in nature and are nonbinding. Submitted emails should have the solicitation number and name in the subject line. Questions are due by 8/5/2025 at 10:00AM. The Solicitation contains the specifications that shall form the basis of a contractual agreement. Vendor shall clearly mark any exceptions, clarifications, or other proposed modifications in its bid. Exceptions to, clarifications of, or modifications of a requirement or term and condition of the Solicitation may result in bid disqualification. The City reserves the right to reject the bid of any vendor as non responsible in accordance with W. Va. Code of State Rules 148- 1-5.3, when the City determines that the vendor submitting the bid does not have the capability to fully perform or lacks the integrity and reliability to assure good-faith performance. Maintenance Bond: The apparent successful Vendor shall provide a two (2) year maintenance bond covering the roofing system if the work impacts an existing roof. The amount of the bond must be equal to the price associated with the percentage of the project impacting the roof. The maintenance bond must be issued and delivered to the City prior to Contract award. The City may accept or reject any bid as whole, or in part, and may make partial awards if appropriate and necessary based on unit price. Pinnacle Consultants (Pinnacle) conducted an asbestos inspection at 1418 Washington St. Charleston, WV on 7/22/2025. The purpose of this inspection was to perform a visual inspection and collect bulk samples of suspect asbestos containing materials (acm) prior to planned renovation. This inspection was a a limited scope inspection performed in accordance with directions agreed upon by the owner and Pinnacle. The inspector(s) certifications and licenses are in Appendix C. The following materials were identified by laboratory analysis or presumed by the inspector to be asbestos containing. • Approx. 5,400sf of Flashing located on Roof • Approx. 1,010sf of Field located on Roof Question Deadline 08/05/2025 at 10:00 AM
Award
Municipal
$40,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2025
September 11, 2025
1418 Washington St E, Charleston, WV
Related To This Project
Charleston, WV
Bid Date: Sep 17 2020
Charleston, WV
Bid Date: Aug 06 2020
Charleston, WV
Bid Date: Jul 11 2019
Charleston, WV
Bid Date: Jul 11 2019
Charleston, WV
Bid Date: Jul 16 2025
Charleston, WV
Bid Date: Jul 31 2025
Charleston, WV
Bid Date: Jul 29 2025
Charleston, WV
Bid Date: Jul 18 2025
Charleston, WV
Bid Date: Jul 24 2025
Charleston, WV
Bid Date: Jul 24 2025
Charleston, WV
Bid Date: Jul 03 2025
Charleston, WV
Bid Date: Jul 11 2025
Charleston, WV
Bid Date: Jul 15 2025
Charleston, WV
Bid Date: Jul 31 2025
Charleston, WV
Bid Date: Jul 22 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
