Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Renovation of a fitness / recreation center in Carpentersville, Illinois. Completed plans call for the renovation of a fitness / recreation center.
Rakow Center Basketball Equipment Replacement Project This project must adhere to all elements of the Prevailing Wage Act. Notless than the most recent prevailing wage rate mustbe paid to all laborers, work ers and mechanics. Cut off for Questions: Tuesday, July 7, 2025 Questions to: Ken Saveley, Facility Services Manager 847-428-7131 x1201 ksaveley@dtpd.org Award Notification Thursday, August 7, 2025 To replace existing basketball equipment with modern, motorized ceiling-suspended basketball backstops and upgrade the control systems. Additionally, provide an alternate option for replacing both gymnasium divider curtains and electrical work for the project. Base Bid: 1. Basketball Equipment Replacement Demolition: Remove six (6) existing ceiling-suspended basketball backstops, including: o Structural supports o Rims o Motors 2. New Equipment Installation: Furnish and install six (6) Jaypro Sports J849 ceiling-suspended basketball backstops, each equipped with: o SBBW-4 electric winches o SBAL-30 Auto-Loc safety straps o SEHA-800 electric height adjusters o GBRUB-42 rectangular glass backboards (42"x72") o MBBP-6XX bolt-on backboard bottom edge pads o GBA-642 breakaway goals o Control System: Provide and install Guardian Pro System Controller Provide and install: o (1) Wall-mounted touchscreen controller o (1) Wireless tablet touchscreen for remote operation Alternate Bids: 1. Center Divider Curtain Provide and install one (1) Jaypro Sports FC_680 fold-up gymnasium divider curtain, 84 feet in length. o Connect new curtain to the Guardian Pro System Controller 2. Outside Curtain - Track Divider o Install new walk-draw curtain fabric using existing walk-draw track and roller carriers. 3. Electrical Work o Provide all necessary electrical wiring, conduit, and terminations to support the new fold-up divider curtain system, basketball backboards and Guardian Pro System Controller o Coordinate with the facility power source for integration and ensure compliance with local electrical codes. o Test and commission electrical system for proper operation upon installation completion.
Post-Bid
Fitness / Rec Centers
$150,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2025
October 1, 2025
665 Barrington Ave, Carpentersville, IL
Related To This Project
Carpentersville, IL
Bid Date: Sep 04 2025
Carpentersville, IL
Bid Date: Aug 20 2025
Carpentersville, IL
Bid Date: Oct 08 2025
Carpentersville, IL
Bid Date: Nov 20 2025
Carpentersville, IL
Bid Date: Nov 19 2025
Carpentersville, IL
Bid Date: Nov 19 2025
Carpentersville, IL
Bid Date: Aug 25 2020
Carpentersville, IL
Bid Date: Nov 17 2025
Carpentersville, IL
Bid Date: May 13 2021
Carpentersville, IL
Bid Date: Jun 26 2025
Carpentersville, IL
Bid Date: Jun 19 2025
Carpentersville, IL
Bid Date: Jun 10 2025
Carpentersville, IL
Bid Date: Jun 03 2025
Carpentersville, IL
Bid Date: May 22 2025
Carpentersville, IL
Bid Date: May 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
