BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2025 at 8:00 PM

Updated August 26, 2025

Renovation of a military facility in Abilene, Texas. Completed plans call for the renovation of a 17,740-square-foot military facility.

The requirement is to coat the R-panel roof (approximately 17,740 sq ft) of the bowling alley at Building B7115, Dyess AFB, TX. The contractor shall: Properly prepare the existing R-panel roof by power washing, scraping, and cleaning to ensure proper adhesion of the new coating; apply an 80-mil seamless, aluminized polyurea spray-on roofing system to the roof according to the manufacturer's requirements; properly dispose of all waste off-base in compliance with regulations and provide the Government with an accounting of the waste weight; obtain approval for the contractor lay-down area; and use exterior methods for material transport to the roof. Any damage to the building or grounds must be repaired. The performance period for this project is 90 calendar days. The wood shake shingle areas are excluded from this scope. Project Title: B7115-BOWLING ALLEY ROOF SEALANT Project Location: Dyess AFB, B7115 Project Description: Prepare the existing R-panel roof by power washing, scraping, and cleaning to ensure proper adhesion of the new coating; apply an 80-mil seamless, alum polyurea spray-on roofing system to the roof according to the manufacturer's requirements; properly dispose of all waste off-base in compliance with regulations and provide th Government with an accounting of the waste weight; The performance period for this project is a negotiable 90 calendar days. Site Visit: The Site Visit held will be 13 August 2025 at 9:00 AM CST. All interested vendors who would like to participate in the site visit are required to email your information you are planning on attending. Email SrA Alan Mwamba at alan.mwamba.ke@us.af.mil and Danny Webb at danny.webb.2@us.af.mil by prior to 7 August 2025. Questions and Answers: Questions are due to SrA Alan Mwamba at alan.mwamba.ke@us.af.mil and Danny Webb at danny.webb.2@us.af.mil on 18 August 2025 at 9:00 AM Proposals are due 25 August 2025 at 1:00 PM CST. Evaluation of Offers: The evaluation for this acquisition will be solely based on the lowest price found technically acceptable. In accordance with FAR 36.204(d) Disclosure of Magnitude of Construction projects: between $270,000.00 and $500,000.00. 1. Cover page on Company letterhead (1 Page) 2. Volume I-Technical, completed RFP, proof of capability to obtain bonds. 3. Volume II - Pricing Breakdown. Pricing Breakdown must be filled out on the attached Pricing Schedule document. In order to be determined Technically acceptable, the Ven must clearly identify major milestones for the requirement. Restating or copying the statement of work will not meet this objective. Additionally, the vendor must meet all require outlined in the Statement of Work. Failure to meet any of the requirements outlined will result in a determination of technical unacceptability. The contractor shall begin performance within 10 calendar days and complete it within 90 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Disclosure of Magnitude of Construction projects: between $270,000.00 and $500,000.00.

Post-Bid

Military

$500,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
26
Bidding Soon
211
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 24, 2025

Project location map

398 Ave C, Abilene, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.