BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2026 at 7:00 PM

Updated January 27, 2026

Site work for a water / sewer project in Vero Beach, Florida. Completed plans call for site work for a water / sewer project.

The Town of Surfside Dune Restoration Project proposes to place approximately 7,300 cubic yards of beach-compatible sand along the dune system between FDEP monuments R-31 and R-38, spanning from just north of 96th Street to north of 82nd Street in Miami-Dade County. The fill material will be sourced from upland sand mines previously approved by the Florida Department of Environmental Protection (FDEP), including Jahna Industries' Ortona Sand Mine Vulcan Materials' Witherspoon Mine Garcia Company's Sand Mine Cemex's Davenport Mine Stewart Materials' Capron Trails Sand Mine. These sources have been used in prior nourishment projects and are considered beach-compatible based on geotechnical characteristics such as grain size, color, and composition. The proposed sand is expected to match the existing beach conditions, which are characterized by medium-grained, moderately sorted sand with a mix of quartz and carbonate materials. The sediment quality control and assurance plan, as outlined in the Quality Control Plan (attached), ensures that all sand placed on the beach meets FDEP standards under Fla. The plan includes rigorous pre-construction sampling, on-site visual and tactile assessments, and post-construction laboratory testing to confirm compliance with parameters such as silt and shell content, Munsell color, and grain size. Any noncompliant material will be remediated through blending or removal. The plan also outlines responsibilities for contractors and permittees, including daily reporting, benchmark sampling, and post-remediation documentation. This comprehensive approach ensures that the sediment used will maintain the natural character and functionality of the coastal system while supporting the goals of the Surfside Dune Restoration Project. In addition, the scope also includes maintaining and restoring the existing dune walking path using the approved Surfside Mix sourced from SDI Quarry. This Surfside Mix consists of a stabilized sand blend selected to meet compaction and maintenance requirements for pedestrian use. The walking path design incorporates a sand barrier element, which helps define the path alignment and support the stability of the path surface over time. Bidders are strongly encouraged to attend the non-mandatory pre-bid meeting, which will include a site visit to review existing walking path conditions and the Town's expectations regarding placement, compaction, and maintenance along this corridor. All questions or requests for clarification regarding this ITB must be submitted in writing to Sandra McCready, M.M.C., Town Clerk, no later than 5:00 PM on Friday, January 23, 2026. Questions may be submitted by mail to the address above or via email Sandra McCready, MMC. Town of Surfside Clerk 9293 Harding Ave, Second Floor Town of Surfside, FL 33154 smccready@townofsurfsidefl.gov. Questions received after the deadline will not be addressed. All timely questions will be answered via Addendum posted on the Town's website.

GC Bidding

Water / Sewer

$3,246,017.00

Public - City

Site Work

25

8

7

6

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
104
Bidding Soon
1,503
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2026

April 10, 2026

Project location map

87th St, Vero Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.