Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 1, 2025 at 8:00 PM
Updated October 2, 2025
Site work and paving for a water / sewer project in Loveland, Ohio. Completed plans call for site work for a water / sewer project.
Fay Road Water Main Replacement Work Under This Project is Generally Defined as the Replacement of 6" Cast Iron Water Main on Fay Road With Approximately 639 Lf of 12" and Approximately 1,960 Lf of 8" Ductile Iron Water Main and Appurtenances Extending From 1499 Fay Road to the Intersection of Susan Drive and the Replacement of 6" Cast Iron Water Main on Earl Drive and Nancard Drive With Approximately 1,282 Lf of 8" Ductile Iron Water Main and Appurtenances Located in Goshen Township. The Owner Expects to Proceed With the Construction Under the Project Immediately After Satisfactory Acceptance and Award of the Construction Bid and Execution of the Contract, With Completion of All Work for Project No. 6401-60207 Within 120 Calendar Days From the Date of the Notice to Proceed. Each Bidder Must Submit Their Bid in Triplicate, One (1) Original and Two (2) Copies With Each Copy Stamped "Copy". Each Bidder Must Deposit With His Bid, Security in the Amount of 100% of the Bid if in the Form of a Bid Bond or in the Amount of Not Less Than Ten (10%) Percent of the Bid if in the Form of a Certified Check, Cashier's Check or Letter of Credit, for and Subject to the Conditions Provided in the Information for Bidders and Pursuant With Ohio Revised Code Section 153.54. Attention of Bidders is Particularly Called to the Requirements as to Safety Regulations, Conditions of Employment to Be Observed and Minimum Wage Rates to Be Paid Under the Contract. All Bids Must Comply With Clermont County General Instructions to Bidders in Addition to the Requirements Set Forth in the Specifications Documents Referenced Herein in Order to Be Considered. Letters of Credit and Bid Bonds Must Be Filed With Original Signatures. Facsimile and Electronic Copies of the Letter of Credit, Bid Bond and Power of Attorney of the Surety Will Be Deemed Non-responsive. No Bidder May Withdraw His Bid for a Period of Sixty (60) Days After the Actual Date of the Opening Thereof. Contract Award Shall Be Made to the Lowest and Best Bidder, and Award May Be Subject to Applicable Funding Agency Approval. The Board of County Commissioners, Clermont County, Ohio, Reserves the Right to Reject Any and All Bids, to Waive Any Informalities in the Bidding Procedure, to Accept Any Bid Which It Deems to Be for the Best Interest of the County and to Hold Such Bids for a Period of Sixty (60) Days Before Taking Action to Award a Contract. In Order to View the Legal Notice Click on the Link Legal Notices Located on the Clermont County Home Page. These Rights Are Reserved Up Until the Time the Contract is Signed by the Board of County Commissioners. Question Deadline 08/01/2025 No interpretation of the meaning of the plans, specifications, or other pre-bid documents will be made to any bidder orally. Every request for such interpretation should be in writing addressed to the Clermont County Water Resources Department, Sanitary Engineering Division, 4400 Haskell Lane, Batavia, Ohio 45103, and to be given consideration must be received at least five days prior to the date fixed for the opening of bids.
Award
Water / Sewer
$1,395,072.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
October 6, 2025
Multiple Locations, Loveland, OH
Related To This Project
Loveland, OH
Bid Date: Aug 06 2025
Loveland, OH
Bid Date: Sep 08 2025
Loveland, OH
--
Loveland, OH
--
Loveland, OH
--
Loveland, OH
Bid Date: Oct 13 2025
Loveland, OH
Bid Date: Oct 14 2025
Loveland, OH
Bid Date: May 20 2025
Loveland, OH
Bid Date: Apr 29 2025
Loveland, OH
Bid Date: Apr 30 2025
Loveland, OH
Bid Date: Apr 14 2025
Loveland, OH
Bid Date: Apr 03 2025
Loveland, OH
Bid Date: Mar 11 2025
Loveland, OH
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
