Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work for a power facility in Durango, Colorado. Working plans call for site work for a power facility.

Notice is hereby given that the Rural Utilities Service (RUS), as required by the National Environmental Policy Act, is issuing an environmental assessment (EA) in connection with possible impacts related to a project proposed by La Plata Electric Association (LPEA). The proposal is for the development of a grid connected solar photovoltaic system and associated Battery Energy Storage System (BESS). LPEA has submitted an application to the RUS for funding of the proposal. FOR FURTHER INFORMATION, CONTACT: Russell Japuntich, Environmental Protection Specialist, USDA Rural Development, Rural Utilities Service, 1400 Independence Ave. SW, Washington, DC 20250-1548, email Russell.Japuntich@USDA.gov. SUPPLEMENTARY INFORMATION: LPEA proposes to construct a 51-acre grid connected solar voltaic system and BESS in La Plata County, at 299 CR 218, Durango, CO 81303. LPEA has prepared an environmental assessment for RUS that describes the project, assesses the proposed project's environmental impacts, and summarizes as applicable any mitigation measures used to minimize environmental assessment and believes that it accurately assesses the impact of the proposed project. No significant impacts are expected as a result of the construction of the project. Written questions and comments should be emailed to RUS at: RUSPublicComments@usda.gov. RUS will accept questions and comments on the environmental assessment for 14 days from the first date of publication of the notice. Any final action by RUS related to the proposed project will be subject to, and contingent upon, compliance with all relevant Federal environmental laws and regulations and completion of environmental review procedures as prescribed by 7 CFR Part 1970, Environmental Policies and Procedures. The estimated construction time will take 9-12 months to complete.

Final Planning

Solar Power Generation

$12,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
83
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

Project location map

To Be Determined, Durango, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.