BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2025 at 8:00 PM

Updated July 8, 2025

This is a service / maintenance or supply contract in Toronto, Ontario. Contact the soliciting agency for additional information.

Toronto and Region Conservation Authority (TRCA) is seeking a Consultant/Consulting Firm to conduct a comprehensive hydrology modelling study for the Carruthers Creek Watershed with the purposes of updating Regional and Design Storm peak flow estimates for future floodplain mapping updates, assessing land use impacts associated with the northeast Pickering development area on downstream flows, and developing stormwater management quantity control criteria to mitigate downstream impacts due to development. The Carruthers Creek Watershed is located within the Town of Ajax and the City of Pickering, in the Region of Durham. It is a relatively small watershed, covering an area of approximately 38 km2, with dimensions ranging from 2-3 km in width and about 18 km in length. The watershed lies within the South Slope and former glacial Lake Iroquois physiographic regions. The current hydrologic model, developed using Visual OTTHYMO V.2.3.2, was built in 2011. Since then, the development in the City of Pickering and Town of Ajax has continued. Additionally, future development in northeast Pickering has been identified in the Region's new Official Plan, which was approved by the Province of Ontario in December 2024. This hydrology update project involves building the hydrology model to simulate design storms and Regional storm, and establishing stormwater management criteria to make new development does not lead to increased peak flows across the watershed. Key deliverables will include a calibrated and validated Visual OTTHYMO hydrologic models, development of unit flow rates stormwater management quantity control criteria, and an overall report summarizing the analyzing process and results. The project will take approximately 15 months to complete, with an anticipated completion date of December 4, 2026. Question Deadline: Fri Jul 18, 2025 4:00:00 PM (EDT) Duration in months: 15 The method of Contractor Selection has not been Determined at this time.

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
456
Active Projects
65
Bidding Soon
4,987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2026

Project location map

Multiple Locations, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.