BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work for a civil project in Shorewood, Minnesota. Completed plans call for site work for a water / sewer project.

The work includes the construction of approximately: 1. Electrical panel replacement. 2. Rehabilitation of existing pressure filter. 3. New chlorine feed system. 4. Various piping and valve replacements. 5. The Water Treatment Plant can be taken off-line on September 1, 2025, for the completion of the filter rehabilitation, piping revisions, and painting as specified. All work must be completed by December 31, 2025, and the Water Treatment Plant ready to be placed back online. Together with numerous related items of work, all in accordance with the Plans and Specifications.

Award

Water / Sewer

$434,700.00

Public - City

Site Work

44

66

4

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
306
Active Projects
159
Bidding Soon
1,536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

September 1, 2025

Project location map

To Be Determined, Shorewood, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.