Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2025 at 8:00 PM
Updated August 5, 2025
Site work and new construction of a mixed-use development in Newberry, South Carolina. Completed plans call for the construction of a detention facility; for site work for a detention facility; and pre-engineered storage facility.
A new construction of a housing facility on the existing site of the Newberry County Detention Center. The building includes a pre-engineered metal building enclosing prefabricated metal cells with concrete masonry wall completing the interior. Question Deadline 07/21/2025 at 5:00 PM ET DIRECT ALL INQUIRIES TO: Studio 8 Design, LLC James Ingram, AIA/NCARB 2722 North Oak Street Valdosta, GA 31602 229.244.1188 jingram@s8darchitects.com SCOPE A. The work to be done under this section of the Specifications shall include the furnishing of labor, material, equipment and tools required for the complete installation of the work indicated on the Drawings and as specified herein. B. All materials, obviously a part of the Communications Infrastructure and necessary to its proper operation, but not specifically mentioned and shown on the Drawings, shall be furnished and installed without additional charge. C. The Drawings and Specifications are complementary to each other and what is called for by one shall be as binding as if called for by both. If a discrepancy exists between the Drawing and Specifications, the higher cost shall be included, and the engineer shall be notified of the discrepancy.
Bid Results
Jails / Prisons
$10,167,000.00
Public - County
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2025
September 29, 2025
3239 Louis Rich Rd, Newberry, SC
Related To This Project
Newberry, SC
--
Newberry, SC
Bid Date: Jul 31 2025
Newberry, SC
Bid Date: Jan 26 2021
Newberry, SC
Bid Date: Aug 06 2019
Newberry, SC
Bid Date: Sep 23 2025
Newberry, SC
--
Newberry, SC
Bid Date: Oct 28 2025
Newberry, SC
Bid Date: Oct 29 2025
Newberry, SC
Bid Date: Jul 31 2025
Newberry, SC
Bid Date: Jun 26 2025
Newberry, SC
--
Newberry, SC
Bid Date: Jun 10 2025
Newberry, SC
Bid Date: May 23 2025
Newberry, SC
Bid Date: May 23 2025
Newberry, SC
Bid Date: May 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
