Site work and paving for a mixed-use development in Sumter, South Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The project consists of the demolition and installation of concrete sidewalks, brick paving, plantings, irrigation decorative crosswalks, utility undergrounding, signage arch, columns and fencing and a guard shack on a locally owned road with some work within the SCDOT Right of Way, along W. College St and N. Main Street. Prior experience, qualifications and product certification will be required. This project will be funded by the City of Sumter The project will follow the City of Sumter Procurement Code. No bid may be withdrawn within a period of ninety (60) days to allow time for Bid review, qualification of Bidder, and approval of award from funding agencies. Question Deadline 07/15/2025 at 5:00 PM ET All questions regarding this Project should be submitted to: Kimberly Shealy, The LandPlan Group South, admin@landplansouth.com. This portion of the project includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on the plans and all other associated miscellaneous items of earthwork construction, as shown on the plans. The CONTRACTOR shall furnish all materials, labor, equipment and incidental items necessary to complete this portion of the work as detailed on the plans and as called for in these Specifications. The work covered by this section consists of the preparation, shaping and compaction of either an un-stabilized or stabilized subgrade, suitable for placement of base course, pavement and shoulders or for the placement of structures as called for on the plans. The CONTRACTOR shall furnish all equipment, tools, labor and materials necessary to complete the work in accordance with the plans and specifications. The work covered by this section consists of the construction of a base composed of an approved aggregate material delivered, placed, compacted and shaped to conform to the lines, grades, depths and typical sections shown on the plans or established by the ENGINEER. 1.1. Erosion and sedimentation control shall be provided by the CONTRACTOR for all areas of the site denuded or otherwise disturbed during construction. The CONTRACTOR shall be responsible for all installation, materials, labor, and maintenance of erosion and sediment control devices, as well as removal of temporary erosion and sediment control devices shown on the plans or required to protect all downstream properties, natural waterways, streams, lakes, ponds, catch basins, drainage ditches, roads, gutters, natural buffer zones, and man-made structures. 1.2. Erosion and sediment control procedures and facilities shall conform to all legally regulated procedures for the control of erosion and sedimentation. 1.1 The work covered by this Section consists of the production, delivery, placement and compaction of various types of bituminous pavements for roadway and parking facilities. All bituminous pavement materials and installation shall conform to the "Standard Specifications for Highway Construction" latest edition, published by the South Carolina Department of Transportation (SCDOT). 1.2 The CONTRACTOR shall furnish all equipment, tools, labor and materials necessary to complete the work in accordance with the plans and specifications. 1.3 REFERENCES Any reference to standard National or State Specifications and/or Regulations refers to the most current published date of the specifications or regulation unless noted otherwise. The design, manufacture, and installation of these materials shall meet or exceed the applicable provisions and recommendations of the noted National Specifications or meet the requirements of the latest revision of these specifications. The work covered by this Section consists of the construction of Portland cement concrete curb, curb and gutter, concrete noses and concrete gutter necessary to complete the project. The CONTRACTOR shall furnish all equipment, tools, labor and materials necessary to complete the project in conformance with the plans and specifications. This work includes the removal of pavement and later reconstruction of base and surface courses affected or damaged by the CONTRACTOR's operations whether inside or outside the normal trench limits as indicated on the Drawings and herein specified. The work covered by this section consists of the construction of cast-in-place or precast concrete, brick masonry or block masonry, catch basins, inlets, junction boxes, spring boxes, manholes or other minor drainage structures, excluding endwalls together with all necessary metal grates, covers, frames, steps and other hardware. The CONTRACTOR shall furnish all equipment, tools, labor, and materials necessary to complete the work in accordance with the plans and specifications. The work covered by this section consists of furnishing all labor, materials, and equipment to perform all necessary operations to topsoil, fine grade, fertilize, mulch and maintain temporary and permanent seeding of all graded, cleared, or disturbed areas during construction. The work covered by this section shall be in conformance with the latest version of local and state Department of Transportation requirements.
Award
Roads / Highways
$1,347,077.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 23, 2025
August 22, 2025
N Main St, Sumter, SC
Related To This Project
Sumter, SC
Bid Date: Aug 12 2025
Sumter, SC
Bid Date: Aug 12 2025
Sumter, SC
Bid Date: Aug 07 2025
Sumter, SC
Bid Date: Jul 24 2025
Sumter, SC
Bid Date: Aug 20 2025
Sumter, SC
Bid Date: Jul 29 2025
Sumter, SC
Bid Date: Aug 13 2025
Sumter, SC
Bid Date: Aug 07 2025
Sumter, SC
Bid Date: Aug 07 2025
Sumter, SC
Bid Date: Jul 22 2025
Sumter, SC
Bid Date: Jul 18 2025
Sumter, SC
Bid Date: Jul 29 2025
Sumter, SC
Bid Date: Jul 30 2025
Sumter, SC
Bid Date: Jul 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.