Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated August 26, 2025
Site work for a water / sewer project in Virgie, Kentucky. Completed plans call for site work for a water / sewer project.
A section of slope has become unstable in the graded area between the undisturbed forest and a previously installed concrete block-tied mat ditch. This instability has constricted the ditch. Sediment from this instability has also been deposited downstream at the intersection with an installed grated concrete ditch, allowing water to bypass the ditch and impact the citizen's yard. The unstable material constricting the ditch will be removed and replaced with a class iii buttress. The affected section of ditch (approx. 80lf) will be removed and replaced with 4' flat bottom class iii ditch. Grates will be removed and replaced after deposited sediment has been removed and modifications complete. To prevent migration of class iii aggregate into the concrete channel, a barrier for aggregate retention will be installed at the interface of the two types of ditch. Sediment deposited in the yard will also be removed to restore grade and drainage. The project limits are 3.37 acres in total with 0.7 acres of planned disturbance. These include project limits of 0.21 acres at the project site (with an expected maximum disturbance within the project limits of approximately 0.2 acres) and 3.16 acres at the off-site waste area (with an expected maximum disturbance within these project limits of 0.5 acres). Trees greater than 3" diameter at breast height will not be cut at the project site or waste area. If required, aml will elect to make a payment to the imperiled bat conservation fund in accordance with a determination from usfws. The project site has previously been disturbed by coal mining operations, road construction, utility installation, residential development, landowner activities, and/or high velocity water flows associated with heavy rain events and flooding. These disturbances consist of significant upheaval, mixing, and removal of earthen material from deep excavation, grading, sub-surface drilling, fill material placement, and erosion. There should be no undisturbed earthen material to a depth of several feet at the areas slated for significant project-related construction activities. Approximately 80 lf of concrete block - tied mat will be removed and a class iii ditch installed. The existing concrete ditch (approx. 60 lf) will have deposited sediment removed. Nothing beyond ephemeral flow has been observed through this area. No portals or cave-like structures will be disturbed by this project. The strict implementation and enforcement of standard aml sediment and erosion control best management practices (bmps) will prevent significant amounts of sediments disturbed by project related activities from entering area streams to create indirect impacts to aquatic resources. Sediment control will be installed prior to beginning any major earth disturbance (excluding initial site preparation for access only) until all measures are installed. These include but are not limited to silt barriers (bales & silt fence). Estimated Length of Project: (Substantial Completion) + 30 Calendar Days (Final Completion) The Division of Engineering and Contract Administration, Commonwealth of Kentucky, reserves the right to reject all bids and to waive all informalities and/or technicalities where the best interest of the Commonwealth may be served.
Award
Water / Sewer
$34,499.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2025
July 30, 2025
78 Elswick Branch Rd, Virgie, KY
Related To This Project
Virgie, KY
--
Virgie, KY
Bid Date: Apr 18 2024
Virgie, KY
Bid Date: Jul 20 2023
Virgie, KY
Bid Date: Aug 22 2022
Murray, KY
Bid Date: Jul 09 2025
Middletown, KY
--
Henderson, KY
Bid Date: Jul 28 2025
Frankfort, KY
Bid Date: Jul 31 2025
Lexington, KY
Bid Date: Jul 29 2025
Fort Campbell, KY
Bid Date: Jul 21 2025
Fort Campbell, KY
Bid Date: Jul 21 2025
Reed, KY
Bid Date: Aug 11 2025
Lexington, KY
Bid Date: Aug 07 2025
Hartford, KY
Bid Date: Jul 23 2025
Henderson, KY
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
