Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 9, 2025 at 8:00 PM
Updated September 10, 2025
Site work and paving for a road / highway in Newnan, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of September 3 , 2025 , this project has not yet been awarded. A timeline for award has not yet been established. The Major Items of Work Consist of: 1. Traffic Control; 2. Thermoplastic Striping; 72.7 miles of roadway Each bid must be accompanied by a bid bond prepared on an accepted form, duly executed by the bidder, in the amount of five percent (5%) of the bid The successful bidder for this contract will be required to furnish a satisfactory performance bond and labor and material payment bond, each in the amount of one hundred percent (100%) of the bid. For more information regarding this issue, please contact ADA Coordinator Chuck Lee at (770) 254-2608. Coweta County encourages the considerations of DBEs (and Disadvantage Business Enterprises) Owner reserves the right to waive any formality or informality or to reject any or all bids, to evaluate bids, and to accept any bid which in its opinion may be for the best interest of Owner Question Deadline 07/31/2025 Every request for such interpretation should be in writing, addressed to the engineer at bpalmer@coweta.ga.us, and in order to be given consideration must be received at least seven (7) days prior to the date fixed for the opening of bids. Work is as specified herein and is to be done in accordance with current GDOT standards and specifications. This description of the work is provided solely for the purpose of identifying and detailing the major items of work on the project and is not intended to include all items of work that will be necessary to complete the project. Traffic Control: The Contractor will select the appropriate traffic control plan for the work in accordance with Part 6 of the current edition of the Manual of Uniform Traffic Control Devices and the Georgia Department of Transportation Standards, Specifications, and Special Provisions. Variation(s) will require approval of the Engineer. The Contractor is responsible for observing and following any weight restricted bridge limits or limited access points throughout the various project locations. The Contractor will be responsible for furnishing, installing, maintaining and removing appropriate Advance Warning signs and temporary traffic control signs for the duration of the project. The Contractor will be responsible for providing, installing and maintaining all other necessary signs, traffic control devices, certified flagmen, materials, equipment and personnel necessary to complete the work. Permanent Striping, Thermoplastic Traffic Stripe: This work consists of furnishing and applying thermoplastic reflectorized pavement marking compound. Ensure that the markings conform to the details and locations specified, the specifications and the Manual on Uniform Traffic Control Devices. Striping work includes all intersection connections to adjacent side streets from main roadway segment. The County will perform necessary clipping and/or brooming prior to installation of any striping.
Award
Roads / Highways
$190,752.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
September 8, 2025
Multiple Locations, Newnan, GA
Related To This Project
Newnan, GA
Bid Date: Jun 04 2020
Newnan, GA
Bid Date: Aug 28 2025
Newnan, GA
Bid Date: Aug 19 2025
Newnan, GA
Bid Date: Oct 28 2025
Newnan, GA
Bid Date: Oct 17 2025
Newnan, GA
Bid Date: Sep 29 2025
Newnan, GA
--
Newnan, GA
Bid Date: Jul 29 2025
Newnan, GA
Bid Date: Jul 18 2025
Newnan, GA
Bid Date: Jun 19 2025
Newnan, GA
Bid Date: Jun 25 2025
Newnan, GA
Bid Date: Jun 26 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
