Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 6, 2025 at 7:00 PM
Updated November 7, 2025
Site work for a road / highway in Newnan, Georgia. Completed plans call for site work for a road / highway.
Traffic Signal Installation US 29 at April Court For furnishing all labor, materials (except as provided), tools, equipment, and incidentals necessary for the construction of the aforementioned project. Bids will be received by the Coweta County Board of Commissioners, Coweta County Georgia, herein referred to as "Owner". The Major Items of Work Consist of: 1. Traffic Control; 2. Traffic Signal Construction 3. Thermoplastic Striping Owner reserves the right to accept or reject any or all bids in the best interest of the County. Work is as specified in the Bid Document and is to be done in accordance with current GDOT standards, specifications, supplemental specifications, and special provisions, if applicable. The Instruction to Bidders, form of Bid, form of Contract, Drawings, forms of Bid Bond, Performance Bond, Payment Bond, and other contract documents are available for review at the Coweta County Public Works office located at 70 Selt Road, Newnan Georgia, 30263 (770- 683-7623). No bid will be accepted from a bidder who has not obtained a set of bid documents from Coweta County Public Works. No bid will be accepted from a bidder who does not meet the pre-qualification requirements outlined in paragraph B.01. Each bid must be accompanied by a bid bond prepared on an accepted form, duly executed by the bidder, in the amount not less than five percent (5%) of the bid. Owner reserves the right to waive any formality or informality or to reject any or all bids, to evaluate bids, and to accept any bid which in its opinion may be for the best interest of Owner. Owner has the right to add to and delete from the contract once it has been awarded. Award, if award is made, will be to the lowest responsive, responsible bidder. The successful bidder for this contract will be required to furnish a satisfactory performance bond and labor and material payment bond, each in the amount of one hundred percent (100%) of the bid. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Nondiscrimination Policy-As set forth in the Americans with Disabilities Act of 1992, the Coweta County government does not discriminate on the basis of disability, and will assist citizens with special need given proper notice (seven working days). For more information regarding this issue, please contact ADA Coordinator Chuck Lee at (770) 254-2608. It is the policy of Coweta County government not to discriminate on the basis of race, gender, age or national origin. Coweta County encourages the considerations of DBE's (and Disadvantage Business Enterprises). Question Deadline 10/10/2025 Every request for such interpretation should be in writing, addressed to the engineer atbpalmer@coweta.ga.us, and in order to be given consideration must be received at least seven (7) days prior to the date fixed for the opening of bids
Award
Roads / Highways
$241,068.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 17, 2025
November 17, 2025
US-29, Newnan, GA
Related To This Project
Newnan, GA
Bid Date: Sep 29 2025
Newnan, GA
--
Newnan, GA
Bid Date: Oct 31 2025
Newnan, GA
Bid Date: Nov 04 2025
Newnan, GA
Bid Date: Nov 11 2025
Newnan, GA
--
Newnan, GA
Bid Date: Nov 10 2025
Newnan, GA
Bid Date: Nov 10 2025
Newnan, GA
Bid Date: Oct 28 2025
Newnan, GA
Bid Date: Aug 19 2025
Newnan, GA
Bid Date: Aug 28 2025
Newnan, GA
Bid Date: Jun 04 2020
Newnan, GA
Bid Date: Aug 07 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
