Published August 21, 2025 at 8:00 PM
Updated August 22, 2025
Renovation of a pre-engineered storage facility in Montgomery, Alabama. Completed plans call for the renovation of a pre-engineered storage facility.
For Cif Warehouse Lighting Upgrades Modernization and Renovation, Montgomery, Al Questions Should Be Addressed, in Writing, to Anne Nieman at Pwba Architects, Inc., Anieman@pwba-architects.com No Later Than 2:00 P.m., Ct, Thursday, July 31, 2025. Certified Checks or Bid Bonds (Power of Attorney is Required) Payable to the Armory Commission of Alabama in an Amount Not Less Than Five (5) Per Cent of the Amount of the Bid, but in No Event More Than $10,000.00 Per Project, Must Accompany the Bidders Proposal. Completed Disclosure Statements Are Preferred to Accompany the Proposal. Performance and Payment Bonds Will Be Required at the Signing of the Contract. The Work performed under this Contract has been reviewed and found, to the Architect's best knowledge, information and belief, to be complete. Final Completion is the stage in the progress of the Work when the Work or designated portion thereof is complete in accordance with the Contract Documents so the Owner can occupy or utilize the Work for its intended use. The Date of Final Completion of the Project designated above is hereby established as the date of execution by the Owner as stated in the General Conditions, which is also the date of commencement of applicable warranties required by the Contract Documents. A. Provide equipment, labor, material, etc., required to make a complete working installation as shown or as specified. B. All equipment and materials shall be installed and connected in accordance with the best engineering practices and in accordance with the manufacturer's recommendations. 1. Where the Engineer determines that the Contractor has installed equipment not conveniently accessible for operation and maintenance, equipment shall be removed and reinstalled or remedial action performed as directed at no additional cost to the Owner. 2. The term "conveniently accessible" is defined as capable of being reached without the use of ladders, or without climbing or crawling under or over obstacles such as motors, fans, pumps, belt guards, transformers, high voltage lines, piping, and ductwork. 3. Contractor is responsible for dimensions and sizes of equipment. Inform Architect in writing of equipment differing from that shown. C. HVAC work includes, but is not limited to: 1. Obtain all permits and inspections including: building permits, health department permits and sewer tap permits. 2. Disconnect, remove and reinstall mechanical services located on or crossing through contract limits, above or below grade, obstructing construction of project or conflicting with completed project or any applicable codes. A. This section applies to all sections of Division 26. B. Furnish and install electrical wiring, systems, equipment, and accessories in accordance with the specifications and drawings. Capacities and ratings of motors, transformers, cable, switchboards, switchgear, panelboards, and other items and arrangements for the specified items are shown on drawings.
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$1,218,500.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
September 5, 2025
1720 Cong W L Dickinson Dr, Montgomery, AL
Related To This Project
Montgomery, AL
Bid Date: Jul 25 2025
Montgomery, AL
Bid Date: Aug 01 2025
Montgomery, AL
Bid Date: Aug 15 2025
Montgomery, AL
Bid Date: Aug 21 2025
Montgomery, AL
Bid Date: Aug 22 2025
Montgomery, AL
--
Montgomery, AL
Bid Date: Aug 12 2025
Montgomery, AL
Bid Date: Jul 24 2025
Montgomery, AL
Bid Date: Jul 16 2025
Montgomery, AL
Bid Date: Jul 22 2025
Montgomery, AL
Bid Date: Jul 29 2025
Montgomery, AL
Bid Date: Aug 26 2025
Montgomery, AL
Bid Date: Aug 20 2025
Montgomery, AL
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.