Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 26, 2025 at 8:00 PM
Updated September 27, 2025
Site work and paving for a civil project in Medina, Ohio. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; and water / sewer project.
Said improvement will involve the abandonment/replacement of an existing 8" water main, removal/replacement of existing culverts including the installation of a 5' x 3' concrete box culvert with concrete footers & full height wingwall. Ditch enclosures, catch basins, excavation/ embankment, full depth pavement removal and other subgrade preparations and asphalt pavement as detailed in the plans for the road realignment will also be included. There shall be two phases to complete this project. Each bidder shall be required to file a bid guaranty with the bid in the form of either: (1) a Bid/Performance Bond in the amount of one-hundred percent (100%) of the amount bid; or (2) a Certified Check, Cashier's Check or Letter of Credit shall equal to 10% of the amount bid, conditioned that the bidder shall, if their bid is accepted, execute a contract in conformity with the bid, plans, details, specifications and bills of material. A Letter of Credit shall be revocable only at the option of the County. Phase one shall include all water main and culvert construction, and the roadway shall be closed for a maximum of 45 calendar days. The completion date for phase one shall be November 28th, 2025. Phase two shall include all excavation/embankment and paving construction for the realignment and the roadway shall be closed for a maximum of 45 calendar days. The completion date for phase two shall be June 26th, 2026. All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of their project. Additionally, contract compliance with the Equal Opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and the Governor's Executive Order 84-9 shall be required. Contractors and Subcontractors must comply with the prevailing wage rates requirements detailed in the Bid Documents. The bid will be awarded to the lowest and best bidder. The Medina County Board of Commissioners reserve the right to reject any and all bids
Award
Roads / Highways
$977,239.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2025
August 29, 2025
To Be Determined, Medina, OH
Related To This Project
Medina, OH
Bid Date: Aug 01 2025
Medina, OH
Bid Date: Aug 15 2025
Medina, OH
Bid Date: Sep 12 2025
Medina, OH
Bid Date: Sep 26 2025
Medina, OH
--
Medina, OH
Bid Date: Jul 23 2025
Medina, OH
Bid Date: Jul 24 2025
Medina, OH
Bid Date: Jul 22 2025
Medina, OH
--
Medina, OH
--
Medina, OH
--
Medina, OH
Bid Date: Jul 09 2025
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed