BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2025 at 8:00 PM

Updated September 2, 2025

Site work and paving for a civil project in Burlington, Iowa. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Construct the Lead Service Line Replacement including all labor, equipment, and materials necessary for excavation, backfill and sitework; water service replacement; surface restoration; seeding and miscellaneous associated work, including cleanup. Each proposal shall be made out on a blank form furnished by the Waterworks and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of five percent (5%) of the bid. Each successful bidder will be required to furnish a corporate surety bond in an amount equal to 100% of its contract price. Said bond shall be issued by a responsible surety approved by the Burlington Municipal Waterworks and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor, and protect and save harmless the Burlington Municipal Waterworks from claims and damages of any kind caused by the operations of the contract and shall also guarantee the maintenance of the improvement caused by failures in materials and construction for a period of two years from and after acceptance of the contract. The work under the contract shall commence within ten (10) days after date set forth in written Notice to Proceed. All work shall be substantially completed by November 21, 2025, subject to any extensions of time which may be granted by the Board of Trustees. Liquidated damages in the amount of Five Hundred Dollars ($500.00) per consecutive calendar day will be assessed for each day that work shall remain uncompleted after November 21, 2025, with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. Inclement weather shall not be considered for extension of the contract period. The Burlington Municipal Waterworks reserves the right to reject any or all bids, to waive informalities, and to enter into such contract, or contracts, as it shall deem to be in the best interest of the Waterworks.

Award

Water / Sewer

$523,856.00

Public - City

Paving, Site Work

24

7

18

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
64
Bidding Soon
862
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 8, 2025

Project location map

Multiple Locations, Burlington, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.