BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work and paving for a mixed-use development in Salisbury Beach, Massachusetts. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Town of Salisbury, Massachusetts, acting through its Department of Public Works, invites sealed bids for Gerrish Road Bridge over Small Pox Brook Bridge Rehabilitation. The work to be done under this contract consists of furnishing all necessary labor, materials and equipment required for the rehabilitation of the Gerrish Road Bridge over Small Pox Brook. The work includes, but is not limited to, partially removing the existing fill over the bridge and temporarily removing and resetting clapper stones in order to perform abutment stone masonry repairs, underwater grout bag installation, wall reconstruction, excavation, cold-planing and resurfacing, installation of a reinforced concrete moment slab, curbing, replacement of guard rail, pavement markings and the provision of safety controls and signing for construction operations. The general characteristics, locations and details of the work to be performed under this contract are specified in the contract specifications and drawings. Direct all inquiries to Christopher W. Jones, P.E, BETA Group, Inc., 315 Norwood Park South, Norwood, Massachusetts, 02062. Email: cjones@beta-inc.com Question Deadline 07/21/2025 To receive consideration, such questions shall be submitted in writing by mail, email or fax to the Engineer (for this purpose, BETA Group, Inc., 315 Norwood Park South, Norwood, Massachusetts, 02062, Telephone No. (781) 255-1982, Fax No. (781) 255-1974, email cjones@beta-inc.com at least seven calendar days before the established date for receipt of Bids The work to be done under this contract consists of furnishing all necessary labor, materials and equipment required for the rehabilitation of the Gerrish Road Bridge over Small Pox Brook, and the reconstruction of the roadway from approximately 80 feet west of the bridge to approximately 70 feet east of the bridge. The work includes partially removing the existing fill over the granite clapper stone bridge and temporarily removing and resetting the clapper stones in order to perform abutment stone masonry repairs, underwater grout bag installation, wall reconstruction, excavation, cold-planing and resurfacing, installation of a reinforced concrete moment slab, curbing, replacement of guard rail, pavement markings and the provision of safety controls and signing for construction operations and other incidental items included in the contract documents necessary to complete the Project

Bid Results

Bridges / Tunnels

$359,445.00

Public - City

Paving, Site Work

17

10

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
568
Active Projects
293
Bidding Soon
3,105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 29, 2025

Project location map

Gerrish Rd, Salisbury Beach, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.