Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated August 29, 2025
Renovation of an educational facility in Holbrook, Arizona. Completed plans call for the renovation of a educational facility.
Holbrook Unified School District, #3 is in Navajo County serving our K-12 Community. The HVAC Project at Parks Elementary, will be funded by the Division of School Facilities. All questions are to be upload to within online Question Submission Deadline August 11, 2025, 12:00pm Locatable Utilities: The contractor shall be responsible for contacting the Blue Stake Center for locating and marking of utilities prior to excavating at Park Elementary School. B. Non-Locatable Utilities: The contractor shall obtain any known information about non-locatable utilities in a pre-construction meeting to be conducted a minimum of two (2) days prior to excavating. A District representative or designee shall respond to identify and mark those utilities in a customary manner. The Contractor shall perform such extra work and charge the owner at actual cost of labor and materials. The Contractor shall have the right to add not more than 10% to the subcontractor's prices for authorized extra work performed solely by the subcontractor's. Such percentage shall include all of the contractor's charges for overhead, profit, administration and supervision. A 10% mark-up for overhead, profit, administration and supervision may be added to the contractor's cost of labor and materials for extra work authorized to be done by their own forces. The subcontractor's maximum allowable additions for overhead, profit, administration and supervision shall not exceed 10% of cost of labor and materials. The contractor and subcontractors will not be allowed any additional compensation beyond the allowable markups for overhead, profit, administration and supervision as noted above. Note: Any additional work must have prior written approval by the District Representative, before the contractor proceeds with work.
Bid Results
Educational
$691,267.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
September 26, 2025
453 N 7th St, Holbrook, AZ
Related To This Project
Holbrook, AZ
Bid Date: Oct 01 2025
Holbrook, AZ
Bid Date: Oct 30 2025
Holbrook, AZ
Bid Date: Oct 30 2025
Holbrook, AZ
Bid Date: Nov 13 2025
Holbrook, AZ
Bid Date: Nov 13 2025
Holbrook, AZ
Bid Date: Jul 14 2025
Holbrook, AZ
Bid Date: Apr 30 2025
Holbrook, AZ
Bid Date: Mar 17 2025
Holbrook, AZ
Bid Date: Feb 26 2025
Holbrook, AZ
Bid Date: Nov 14 2025
Holbrook, AZ
--
Holbrook, AZ
--
Holbrook, AZ
--
Holbrook, AZ
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
