Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 7, 2026 at 8:00 PM
Updated August 13, 2026
Renovation of a mixed-use development in Clinton, Tennessee. Working plans call for the renovation of a museum; and fitness / recreation center.
Replacement of floor in gymnasium and all required related work. Remove existing multi-layered flooring from slab in gymnasium including synthetic flooring, wood flooring, diagonal wood subfloor, wood sleepers, and all bituminous substances on the slab. After removal of all flooring, the concrete slab is to be evaluated for any currently unseen damage. Repair or replace concrete slab as needed, seal, and re-stripe for gymnasium use. As of August 7, 2026, the architect is planning on wrapping up the construction documents phase in the next couple of weeks ahead of the schedule. Depending on how long the review period takes, advertisement for bidding might occur bid by the first of next month. A timeline for construction has yet to be announced. This project receives automated updates from sources only and will not be actively tracked by our Content team. Information is provided as-is for planning awareness. Should you wish to provide information on this project or are seeking an update, please email contentcase@constructconnect.com.
Final Planning
Fitness / Rec Centers
$1,280,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2026
101 School St, Clinton, TN
Related To This Project
Clinton, TN
Bid Date: Aug 05 2025
Clinton, TN
Bid Date: Aug 15 2025
Clinton, TN
Bid Date: Aug 15 2025
Clinton, TN
Bid Date: Aug 08 2025
Clinton, TN
Bid Date: Oct 03 2025
Clinton, TN
Bid Date: Oct 16 2025
Clinton, TN
Bid Date: Nov 13 2025
Clinton, TN
Bid Date: Nov 07 2025
Clinton, TN
Bid Date: Jun 24 2025
Clinton, TN
Bid Date: Jun 27 2025
Clinton, TN
Bid Date: May 19 2025
Clinton, TN
Bid Date: May 27 2025
Clinton, TN
Bid Date: May 13 2025
Clinton, TN
Bid Date: May 09 2025
Clinton, TN
Bid Date: May 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
