Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 15, 2025 at 8:00 PM
Updated July 23, 2025
Renovation of a municipal facility in Allen, Texas. Completed plans call for the renovation of a municipal facility.
The city of Allen is seeking to renovate the Human Resources(HR) cubicle Renovation area as we bring in a new cubicle system. This will involve fire sprinklers, lighting and mechanical systems. No pre-submittal meeting will not be held Question Deadline 07/15/2025 at 2:00 PM CT Online - Q&A FOR ADDITIONAL INFORMATION CONCERNING THIS PROPOSAL PLEASE CONTACT: EVA OSBORNE, PURCHASING AGENT, 214-509-4631 All questions regarding bid/proposal preparation, selection process, specifications and interpretations of the terms and conditions of the bid/proposal shall be submitted in writing. Remove existing cubicles and relocate them to the city hall basement. Fire Sprinklers: Fire Sprinklers to be adjusted from existing design to provide proper coverage in the cube replacement area (Yellow) on spec sheet. Adding 2 new sprinkler heads (Match existing) and connect to existing system. Final locations to be determined by the city. Fire Alarms: Adjust Fire Alarms as required to meet code. Electrical: Provide Home Run to the electrical panel for DIRTT modular electrical boxes located above ceiling. Adding 5 new LED lights (2'x4'). Type to be Lithonia 2BLT with curved ribbed diffuser. Final location to be determined by the city. Dispose of existing lights in city dumpster. New lighting to include electrical home run for area and 5 separate locations for use with 5 separate light switches. (4 rooms and 1 main hallway). Light switches to be included in bid. Paint: Sherwin Williams Eggshell, Pure White SW7005 & Network Grey SW7073. Baseboards: Need to match the existing. Furniture: removal of all furniture from area(2 nd Floor) to basement. HVAC: Adjust HVAC supply and return to accommodate the new cubes in area. Adding 3 HVAC diffusers (2'x2' size). Connect diffusers to the existing system. Final locations to be determined by city. Process: Provide construction timeline and how to minimize the downtime for the city in the work area
Post-Bid
Municipal
$10,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
August 11, 2025
305 Century Pkwy, Allen, TX
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
