Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 18, 2025 at 7:00 PM
Updated November 19, 2025
Site work and paving for a mixed-use development in Missoula, Montana. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.
TA 32(130) - Shared-use path crack sealing, fog sealing, replacing distressed pavement and tree root removal, ADA upgrades, and a new overlay in specific path sections where needed. The path section along US Highway 93 begins at the Missoula/Ravalli County line at Reference Post 76.8 and extends north to mile marker 82.9, at the north end of the Lolo Creek Bridge. TA 41(93) - Shared-use path crack sealing, fog sealing, replacing distressed pavement and tree root removal, ADA upgrades, and a new overlay in specific sections where needed. The path section along US Highway 93 extends from Reference Post 49.6, north of Hamilton, to the Missoula/Ravalli County line at Reference Post 77. The path section along Secondary 373 extends from Reference Post 0.0, near the intersection with US 93 and continues east to Reference Post 2.0, ending at the intersection with Secondary 269 in Corvallis. Contract to be completed as outlined in the Contract Time special provision found in the proposal. This project is under the jurisdiction of the Missoula District Administrator. Uniform No. 10452000, 10449000 Value - $1,000,000 - $5,000,000 MT DOT - Call Order 205 - Path Preservation-Ravalli Co *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 10/20/2025 at 10:00 AM MT on the Monday before the bid letting https://www.mdt.mt.gov/business/contracting/qacurrent.shtml
Award
Roads / Highways
$1,539,401.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
May 4, 2026
US-93, Missoula, MT
Related To This Project
Missoula, MT
Bid Date: Nov 05 2025
Missoula, MT
Bid Date: Oct 30 2025
Missoula, MT
Bid Date: Nov 11 2025
Missoula, MT
--
Missoula, MT
Bid Date: Oct 22 2025
Missoula, MT
Bid Date: Jul 13 2021
Missoula, MT
Bid Date: Sep 24 2025
Missoula, MT
--
Missoula, MT
Bid Date: Sep 23 2025
Missoula, MT
Bid Date: Sep 18 2025
Missoula, MT
Bid Date: Sep 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
